SYSTEM_ELEMENT SYSTEM_ATTRIBUTE START_TIME STOP_TIME ATTRIBUTE_VALUE ATTRIBUTE_UNITS ANNOTATION TIME_OF_LAST_UPDATE
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131230000CS 20260201000000CS 395 MW 20260131195420CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131230000CS 20260201000000CS 255 MW 20260131195345CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131210000CS 20260131220000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131200000CS 20260131210000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131190000CS 20260131200000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131180000CS 20260131190000CS 350 MW 20260131151609CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131170000CS 20260131180000CS 370 MW 20260131151609CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131160000CS 20260131170000CS 433 MW 20260131153155CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131150000CS 20260131160000CS 425 MW 20260131133246CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131140000CS 20260131150000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131130000CS 20260131140000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131120000CS 20260131130000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131110000CS 20260131120000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131100000CS 20260131110000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131090000CS 20260131100000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131080000CS 20260131090000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131070000CS 20260131080000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131060000CS 20260131070000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131050000CS 20260131060000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131040000CS 20260131050000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131030000CS 20260131040000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131020000CS 20260131030000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131010000CS 20260131020000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131000000CS 20260131010000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130230000CS 20260131000000CS 350 MW 20260130092232CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131210000CS 20260131220000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131200000CS 20260131210000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131190000CS 20260131200000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131180000CS 20260131190000CS 300 MW 20260131151609CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131170000CS 20260131180000CS 280 MW 20260131151609CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131160000CS 20260131170000CS 217 MW 20260131153155CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131150000CS 20260131160000CS 225 MW 20260131133131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131140000CS 20260131150000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131130000CS 20260131140000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131120000CS 20260131130000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131110000CS 20260131120000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131100000CS 20260131110000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131090000CS 20260131100000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131080000CS 20260131090000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131070000CS 20260131080000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131060000CS 20260131070000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131050000CS 20260131060000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131040000CS 20260131050000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131030000CS 20260131040000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131020000CS 20260131030000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131010000CS 20260131020000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131000000CS 20260131010000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130230000CS 20260131000000CS 300 MW 20260130092108CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130210000CS 20260130220000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130200000CS 20260130210000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130190000CS 20260130200000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130180000CS 20260130190000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130170000CS 20260130180000CS 425 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130160000CS 20260130170000CS 450 MW 20260130134125CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130150000CS 20260130160000CS 450 MW 20260130134125CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130140000CS 20260130150000CS 380 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130130000CS 20260130140000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130120000CS 20260130130000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130110000CS 20260130120000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130100000CS 20260130110000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130090000CS 20260130100000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130080000CS 20260130090000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130070000CS 20260130080000CS 425 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130060000CS 20260130070000CS 425 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130050000CS 20260130060000CS 425 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130040000CS 20260130050000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130030000CS 20260130040000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130020000CS 20260130030000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130010000CS 20260130020000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130000000CS 20260130010000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129230000CS 20260130000000CS 350 MW 20260129081648CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130210000CS 20260130220000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130200000CS 20260130210000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130190000CS 20260130200000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130180000CS 20260130190000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130170000CS 20260130180000CS 225 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130160000CS 20260130170000CS 200 MW 20260130134019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130150000CS 20260130160000CS 200 MW 20260130134019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130140000CS 20260130150000CS 270 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130130000CS 20260130140000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130120000CS 20260130130000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130110000CS 20260130120000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130100000CS 20260130110000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130090000CS 20260130100000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130080000CS 20260130090000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130070000CS 20260130080000CS 225 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130060000CS 20260130070000CS 225 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130050000CS 20260130060000CS 225 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130040000CS 20260130050000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130030000CS 20260130040000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130020000CS 20260130030000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130010000CS 20260130020000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130000000CS 20260130010000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129230000CS 20260130000000CS 300 MW 20260129081524CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129210000CS 20260129220000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129200000CS 20260129210000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129190000CS 20260129200000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129180000CS 20260129190000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129170000CS 20260129180000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129160000CS 20260129170000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129150000CS 20260129160000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129140000CS 20260129150000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129130000CS 20260129140000CS 415 MW 20260129072520CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129120000CS 20260129130000CS 415 MW 20260129072520CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129110000CS 20260129120000CS 430 MW 20260129083147CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129100000CS 20260129110000CS 430 MW 20260129083147CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129090000CS 20260129100000CS 440 MW 20260129072520CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129080000CS 20260129090000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129070000CS 20260129080000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129060000CS 20260129070000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129050000CS 20260129060000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129040000CS 20260129050000CS 425 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129030000CS 20260129040000CS 400 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129020000CS 20260129030000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129010000CS 20260129020000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129000000CS 20260129010000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128230000CS 20260129000000CS 350 MW 20260128081846CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129210000CS 20260129220000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129200000CS 20260129210000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129190000CS 20260129200000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129180000CS 20260129190000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129170000CS 20260129180000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129160000CS 20260129170000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129150000CS 20260129160000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129140000CS 20260129150000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129130000CS 20260129140000CS 235 MW 20260129072405CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129120000CS 20260129130000CS 235 MW 20260129072405CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129110000CS 20260129120000CS 220 MW 20260129083053CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129100000CS 20260129110000CS 220 MW 20260129083053CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129090000CS 20260129100000CS 210 MW 20260129072405CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129080000CS 20260129090000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129070000CS 20260129080000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129060000CS 20260129070000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129050000CS 20260129060000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129040000CS 20260129050000CS 225 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129030000CS 20260129040000CS 250 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129020000CS 20260129030000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129010000CS 20260129020000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129000000CS 20260129010000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128230000CS 20260129000000CS 300 MW 20260128081722CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128210000CS 20260128220000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128200000CS 20260128210000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128190000CS 20260128200000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128180000CS 20260128190000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128170000CS 20260128180000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128160000CS 20260128170000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128150000CS 20260128160000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128140000CS 20260128150000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128130000CS 20260128140000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128120000CS 20260128130000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128110000CS 20260128120000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128100000CS 20260128110000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128090000CS 20260128100000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128080000CS 20260128090000CS 425 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128070000CS 20260128080000CS 425 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128060000CS 20260128070000CS 425 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128050000CS 20260128060000CS 425 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128040000CS 20260128050000CS 425 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128030000CS 20260128040000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128020000CS 20260128030000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128010000CS 20260128020000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128000000CS 20260128010000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260127230000CS 20260128000000CS 350 MW 20260127092526CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128210000CS 20260128220000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128200000CS 20260128210000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128190000CS 20260128200000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128180000CS 20260128190000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128170000CS 20260128180000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128160000CS 20260128170000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128150000CS 20260128160000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128140000CS 20260128150000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128130000CS 20260128140000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128120000CS 20260128130000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128110000CS 20260128120000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128100000CS 20260128110000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128090000CS 20260128100000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128080000CS 20260128090000CS 225 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128070000CS 20260128080000CS 225 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128060000CS 20260128070000CS 225 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128050000CS 20260128060000CS 225 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128040000CS 20260128050000CS 225 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128030000CS 20260128040000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128020000CS 20260128030000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128010000CS 20260128020000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128000000CS 20260128010000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260127230000CS 20260128000000CS 300 MW 20260127092422CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126210000CS 20260126220000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126200000CS 20260126210000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126190000CS 20260126200000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126180000CS 20260126190000CS 390 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126170000CS 20260126180000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126160000CS 20260126170000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126150000CS 20260126160000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126140000CS 20260126150000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126130000CS 20260126140000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126120000CS 20260126130000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126110000CS 20260126120000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126100000CS 20260126110000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126090000CS 20260126100000CS 425 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126080000CS 20260126090000CS 400 MW 20260126073023CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126070000CS 20260126080000CS 402 MW 20260126063636CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126060000CS 20260126070000CS 402 MW 20260126053611CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126050000CS 20260126060000CS 398 MW 20260126043822CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126040000CS 20260126050000CS 402 MW 20260126033301CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126030000CS 20260126040000CS 400 MW 20260126014027CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126020000CS 20260126030000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126010000CS 20260126020000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126000000CS 20260126010000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125230000CS 20260126000000CS 350 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126210000CS 20260126220000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126200000CS 20260126210000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126190000CS 20260126200000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126180000CS 20260126190000CS 260 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126170000CS 20260126180000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126160000CS 20260126170000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126150000CS 20260126160000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126140000CS 20260126150000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126130000CS 20260126140000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126120000CS 20260126130000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126110000CS 20260126120000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126100000CS 20260126110000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126090000CS 20260126100000CS 225 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126080000CS 20260126090000CS 250 MW 20260126073023CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126070000CS 20260126080000CS 246 MW 20260126063636CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126060000CS 20260126070000CS 246 MW 20260126053611CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126050000CS 20260126060000CS 252 MW 20260126043822CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126040000CS 20260126050000CS 222 MW 20260126033301CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126030000CS 20260126040000CS 248 MW 20260126011313CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126020000CS 20260126030000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126010000CS 20260126020000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126000000CS 20260126010000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125230000CS 20260126000000CS 300 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125210000CS 20260125220000CS 416 MW 20260125203205CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125200000CS 20260125210000CS 414 MW 20260125193252CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125190000CS 20260125200000CS 410 MW 20260125183251CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125180000CS 20260125190000CS 409 MW 20260125173343CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125170000CS 20260125180000CS 397 MW 20260125163344CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125160000CS 20260125170000CS 422 MW 20260125153536CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125150000CS 20260125160000CS 404 MW 20260125143336CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125140000CS 20260125150000CS 464 MW 20260125133235CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125130000CS 20260125140000CS 515 MW 20260125123232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125120000CS 20260125130000CS 526 MW 20260125113234CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125110000CS 20260125120000CS 543 MW 20260125103200CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125100000CS 20260125110000CS 544 MW 20260125093751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125090000CS 20260125100000CS 533 MW 20260125083345CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125080000CS 20260125090000CS 499 MW 20260125073344CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125070000CS 20260125080000CS 482 MW 20260125063129CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125060000CS 20260125070000CS 470 MW 20260125053545CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125050000CS 20260125060000CS 486 MW 20260125043944CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125040000CS 20260125050000CS 501 MW 20260125033601CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125030000CS 20260125040000CS 522 MW 20260125023322CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125020000CS 20260125030000CS 536 MW 20260124234428CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125010000CS 20260125020000CS 536 MW 20260124234428CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125000000CS 20260125010000CS 535 MW 20260124233446CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124230000CS 20260125000000CS 531 MW 20260124224247CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125210000CS 20260125220000CS 234 MW 20260125203205CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125200000CS 20260125210000CS 236 MW 20260125193252CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125190000CS 20260125200000CS 240 MW 20260125183251CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125180000CS 20260125190000CS 241 MW 20260125173343CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125170000CS 20260125180000CS 253 MW 20260125163344CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125160000CS 20260125170000CS 148 MW 20260125153536CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125150000CS 20260125160000CS 166 MW 20260125143336CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125140000CS 20260125150000CS 100 MW 20260125133020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125130000CS 20260125140000CS 95 MW 20260125112506CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125120000CS 20260125130000CS 94 MW 20260125093047CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125110000CS 20260125120000CS 94 MW 20260125093047CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125100000CS 20260125110000CS 77 MW 20260125073227CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125090000CS 20260125100000CS 77 MW 20260125073227CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125080000CS 20260125090000CS 49 MW 20260125052544CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125070000CS 20260125080000CS 49 MW 20260125052544CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125060000CS 20260125070000CS 103 MW 20260125053545CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125050000CS 20260125060000CS 103 MW 20260125043944CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125040000CS 20260125050000CS 61 MW 20260125022318CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125030000CS 20260125040000CS 114 MW 20260125014117CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125020000CS 20260125030000CS 114 MW 20260124234114CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125010000CS 20260125020000CS 114 MW 20260124234114CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125000000CS 20260125010000CS 40 MW 20260124221932CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124230000CS 20260125000000CS 97 MW 20260124215000CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124210000CS 20260124220000CS 523 MW 20260124203404CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124200000CS 20260124210000CS 510 MW 20260124193407CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124190000CS 20260124200000CS 512 MW 20260124183440CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124180000CS 20260124190000CS 496 MW 20260124173351CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124170000CS 20260124180000CS 502 MW 20260124163513CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124160000CS 20260124170000CS 508 MW 20260124153400CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124150000CS 20260124160000CS 458 MW 20260124143428CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124140000CS 20260124150000CS 515 MW 20260124133234CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124130000CS 20260124140000CS 563 MW 20260124123425CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124120000CS 20260124130000CS 574 MW 20260124104328CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124110000CS 20260124120000CS 574 MW 20260124083545CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124100000CS 20260124110000CS 574 MW 20260124083545CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124090000CS 20260124100000CS 476 MW 20260124064557CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124080000CS 20260124090000CS 350 MW 20260124070054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124070000CS 20260124080000CS 507 MW 20260124053220CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124060000CS 20260124070000CS 508 MW 20260124053415CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124050000CS 20260124060000CS 523 MW 20260124043331CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124040000CS 20260124050000CS 552 MW 20260123231900CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124030000CS 20260124040000CS 552 MW 20260123231900CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124020000CS 20260124030000CS 542 MW 20260123230049CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124010000CS 20260124020000CS 508 MW 20260124000048CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124000000CS 20260124010000CS 529 MW 20260123224721CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123230000CS 20260124000000CS 553 MW 20260123202717CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124210000CS 20260124220000CS 96 MW 20260124194921CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124200000CS 20260124210000CS 125 MW 20260124185023CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124190000CS 20260124200000CS 126 MW 20260124160223CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124180000CS 20260124190000CS 86 MW 20260124160223CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124170000CS 20260124180000CS 0 MW 20260124132850CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124160000CS 20260124170000CS 0 MW 20260124132453CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124150000CS 20260124160000CS 0 MW 20260124123700CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124140000CS 20260124150000CS 0 MW 20260124120239CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124130000CS 20260124140000CS 36 MW 20260124111109CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124120000CS 20260124130000CS 73 MW 20260124095458CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124110000CS 20260124120000CS 76 MW 20260124082818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124100000CS 20260124110000CS 76 MW 20260124082818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124090000CS 20260124100000CS 174 MW 20260124062342CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124080000CS 20260124090000CS 174 MW 20260124062342CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124070000CS 20260124080000CS 98 MW 20260124010458CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124060000CS 20260124070000CS 98 MW 20260124010458CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124050000CS 20260124060000CS 98 MW 20260124010458CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124040000CS 20260124050000CS 98 MW 20260123231254CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124030000CS 20260124040000CS 98 MW 20260123231254CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124020000CS 20260124030000CS 108 MW 20260123225655CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124010000CS 20260124020000CS 77 MW 20260123225655CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124000000CS 20260124010000CS 121 MW 20260123224332CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123230000CS 20260124000000CS 97 MW 20260123202348CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123210000CS 20260123220000CS 505 MW 20260123172155CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123200000CS 20260123210000CS 550 MW 20260123172155CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123190000CS 20260123200000CS 550 MW 20260123150843CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123180000CS 20260123190000CS 550 MW 20260123150843CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123170000CS 20260123180000CS 550 MW 20260123150843CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123160000CS 20260123170000CS 550 MW 20260123124529CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123150000CS 20260123160000CS 550 MW 20260123124529CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123140000CS 20260123150000CS 550 MW 20260123124529CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123130000CS 20260123140000CS 550 MW 20260123095012CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123120000CS 20260123130000CS 550 MW 20260123095012CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123110000CS 20260123120000CS 550 MW 20260123095012CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123100000CS 20260123110000CS 550 MW 20260123083845CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123090000CS 20260123100000CS 550 MW 20260123063831CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123080000CS 20260123090000CS 550 MW 20260123063831CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123070000CS 20260123080000CS 496 MW 20260122231918CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123060000CS 20260123070000CS 496 MW 20260122231918CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123050000CS 20260123060000CS 496 MW 20260122231918CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123040000CS 20260123050000CS 496 MW 20260123023730CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123030000CS 20260123040000CS 496 MW 20260122202319CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123020000CS 20260123030000CS 496 MW 20260122202319CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123010000CS 20260123020000CS 496 MW 20260122202319CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123000000CS 20260123010000CS 496 MW 20260122202319CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122230000CS 20260123000000CS 496 MW 20260122202319CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123210000CS 20260123220000CS 145 MW 20260123171541CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123200000CS 20260123210000CS 100 MW 20260123171541CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123190000CS 20260123200000CS 100 MW 20260123150747CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123180000CS 20260123190000CS 100 MW 20260123150747CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123170000CS 20260123180000CS 100 MW 20260123150747CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123160000CS 20260123170000CS 100 MW 20260123124404CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123150000CS 20260123160000CS 100 MW 20260123124404CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123140000CS 20260123150000CS 100 MW 20260123124404CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123130000CS 20260123140000CS 100 MW 20260123094553CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123120000CS 20260123130000CS 100 MW 20260123094553CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123110000CS 20260123120000CS 100 MW 20260123094553CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123100000CS 20260123110000CS 100 MW 20260123083619CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123090000CS 20260123100000CS 100 MW 20260123063412CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123080000CS 20260123090000CS 100 MW 20260123063412CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123070000CS 20260123080000CS 154 MW 20260122231659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123060000CS 20260123070000CS 154 MW 20260122231659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123050000CS 20260123060000CS 154 MW 20260122231659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123040000CS 20260123050000CS 154 MW 20260123023555CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123030000CS 20260123040000CS 154 MW 20260122201730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123020000CS 20260123030000CS 154 MW 20260122201730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123010000CS 20260123020000CS 154 MW 20260122201730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123000000CS 20260123010000CS 154 MW 20260122201730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122230000CS 20260123000000CS 154 MW 20260122201730CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122210000CS 20260122220000CS 451 MW 20260122175422CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122200000CS 20260122210000CS 496 MW 20260122181321CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122190000CS 20260122200000CS 498 MW 20260122161839CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122180000CS 20260122190000CS 498 MW 20260122152057CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122170000CS 20260122180000CS 479 MW 20260122155127CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122160000CS 20260122170000CS 498 MW 20260122140113CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122150000CS 20260122160000CS 481 MW 20260122143311CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122140000CS 20260122150000CS 506 MW 20260122133242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122130000CS 20260122140000CS 499 MW 20260122112812CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122120000CS 20260122130000CS 524 MW 20260122113941CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122110000CS 20260122120000CS 428 MW 20260122100923CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122100000CS 20260122110000CS 483 MW 20260122084840CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122090000CS 20260122100000CS 447 MW 20260122075849CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122080000CS 20260122090000CS 517 MW 20260122062455CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122070000CS 20260122080000CS 540 MW 20260122063410CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122060000CS 20260122070000CS 421 MW 20260122004444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122050000CS 20260122060000CS 421 MW 20260122004444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122040000CS 20260122050000CS 475 MW 20260122004444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122030000CS 20260122040000CS 468 MW 20260121220415CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122020000CS 20260122030000CS 488 MW 20260121220415CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122010000CS 20260122020000CS 485 MW 20260122003200CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122000000CS 20260122010000CS 481 MW 20260121233751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121230000CS 20260122000000CS 476 MW 20260121223150CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122210000CS 20260122220000CS 199 MW 20260122174519CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122200000CS 20260122210000CS 154 MW 20260122181201CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122190000CS 20260122200000CS 152 MW 20260122161645CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122180000CS 20260122190000CS 152 MW 20260122151731CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122170000CS 20260122180000CS 171 MW 20260122154912CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122160000CS 20260122170000CS 152 MW 20260122135836CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122150000CS 20260122160000CS 153 MW 20260122135107CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122140000CS 20260122150000CS 112 MW 20260122124610CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122130000CS 20260122140000CS 151 MW 20260122112657CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122120000CS 20260122130000CS 96 MW 20260122100636CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122110000CS 20260122120000CS 86 MW 20260122095542CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122100000CS 20260122110000CS 167 MW 20260122084656CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122090000CS 20260122100000CS 203 MW 20260122075733CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122080000CS 20260122090000CS 133 MW 20260122061824CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122070000CS 20260122080000CS 98 MW 20260122063410CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122060000CS 20260122070000CS 229 MW 20260122004330CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122050000CS 20260122060000CS 229 MW 20260122004330CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122040000CS 20260122050000CS 175 MW 20260122004330CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122030000CS 20260122040000CS 182 MW 20260121215832CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122020000CS 20260122030000CS 162 MW 20260121215846CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122010000CS 20260122020000CS 143 MW 20260122003200CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122000000CS 20260122010000CS 146 MW 20260121233751CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121230000CS 20260122000000CS 157 MW 20260121223150CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120210000CS 20260120220000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120200000CS 20260120210000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120190000CS 20260120200000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120180000CS 20260120190000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120170000CS 20260120180000CS 395 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120160000CS 20260120170000CS 395 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120150000CS 20260120160000CS 395 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120140000CS 20260120150000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120130000CS 20260120140000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120120000CS 20260120130000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120110000CS 20260120120000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120100000CS 20260120110000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120090000CS 20260120100000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120080000CS 20260120090000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120070000CS 20260120080000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120060000CS 20260120070000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120050000CS 20260120060000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120040000CS 20260120050000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120030000CS 20260120040000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120020000CS 20260120030000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120010000CS 20260120020000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120000000CS 20260120010000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119230000CS 20260120000000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121210000CS 20260121220000CS 475 MW 20260121195614CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121200000CS 20260121210000CS 425 MW 20260121185614CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121190000CS 20260121200000CS 400 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121180000CS 20260121190000CS 435 MW 20260121173311CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121170000CS 20260121180000CS 463 MW 20260121164035CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121160000CS 20260121170000CS 450 MW 20260121153446CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121150000CS 20260121160000CS 450 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121140000CS 20260121150000CS 450 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121130000CS 20260121140000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121120000CS 20260121130000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121110000CS 20260121120000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121100000CS 20260121110000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121090000CS 20260121100000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121080000CS 20260121090000CS 425 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121070000CS 20260121080000CS 425 MW 20260121060051CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121060000CS 20260121070000CS 425 MW 20260121050056CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121050000CS 20260121060000CS 425 MW 20260121040057CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121040000CS 20260121050000CS 395 MW 20260120222242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121030000CS 20260121040000CS 395 MW 20260120222242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121020000CS 20260121030000CS 395 MW 20260120222242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121010000CS 20260121020000CS 395 MW 20260120222242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121000000CS 20260121010000CS 395 MW 20260120222242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120230000CS 20260121000000CS 350 MW 20260120090256CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121210000CS 20260121220000CS 175 MW 20260121195500CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121200000CS 20260121210000CS 225 MW 20260121185510CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121190000CS 20260121200000CS 250 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121180000CS 20260121190000CS 114 MW 20260121173311CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121170000CS 20260121180000CS 99 MW 20260121150316CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121160000CS 20260121170000CS 191 MW 20260121142844CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121150000CS 20260121160000CS 200 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121140000CS 20260121150000CS 200 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121130000CS 20260121140000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121120000CS 20260121130000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121110000CS 20260121120000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121100000CS 20260121110000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121090000CS 20260121100000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121080000CS 20260121090000CS 225 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121070000CS 20260121080000CS 225 MW 20260121060051CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121060000CS 20260121070000CS 225 MW 20260121050056CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121050000CS 20260121060000CS 225 MW 20260121040057CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121040000CS 20260121050000CS 255 MW 20260120222148CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121030000CS 20260121040000CS 255 MW 20260120222148CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121020000CS 20260121030000CS 255 MW 20260120222148CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121010000CS 20260121020000CS 255 MW 20260120222148CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121000000CS 20260121010000CS 255 MW 20260120222148CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120230000CS 20260121000000CS 300 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120210000CS 20260120220000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120200000CS 20260120210000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120190000CS 20260120200000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120180000CS 20260120190000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120170000CS 20260120180000CS 255 MW 20260120135541CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120160000CS 20260120170000CS 255 MW 20260120135541CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120150000CS 20260120160000CS 255 MW 20260120135541CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120140000CS 20260120150000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120130000CS 20260120140000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120120000CS 20260120130000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120110000CS 20260120120000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120100000CS 20260120110000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120090000CS 20260120100000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120080000CS 20260120090000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120070000CS 20260120080000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120060000CS 20260120070000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120050000CS 20260120060000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120040000CS 20260120050000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120030000CS 20260120040000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120020000CS 20260120030000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120010000CS 20260120020000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120000000CS 20260120010000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119230000CS 20260120000000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120210000CS 20260120220000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120200000CS 20260120210000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120190000CS 20260120200000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120180000CS 20260120190000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120170000CS 20260120180000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120160000CS 20260120170000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120150000CS 20260120160000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120140000CS 20260120150000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120130000CS 20260120140000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120120000CS 20260120130000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120110000CS 20260120120000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120100000CS 20260120110000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120090000CS 20260120100000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120080000CS 20260120090000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120070000CS 20260120080000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120060000CS 20260120070000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120050000CS 20260120060000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120040000CS 20260120050000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120030000CS 20260120040000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120020000CS 20260120030000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120010000CS 20260120020000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120000000CS 20260120010000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119230000CS 20260120000000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119210000CS 20260119220000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119200000CS 20260119210000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119190000CS 20260119200000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119180000CS 20260119190000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119170000CS 20260119180000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119160000CS 20260119170000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119150000CS 20260119160000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119140000CS 20260119150000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119130000CS 20260119140000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119120000CS 20260119130000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119110000CS 20260119120000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119100000CS 20260119110000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119090000CS 20260119100000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119080000CS 20260119090000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119070000CS 20260119080000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119060000CS 20260119070000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119050000CS 20260119060000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119040000CS 20260119050000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119030000CS 20260119040000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119020000CS 20260119030000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119010000CS 20260119020000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119000000CS 20260119010000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260118230000CS 20260119000000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120210000CS 20260120220000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120200000CS 20260120210000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120190000CS 20260120200000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120180000CS 20260120190000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120170000CS 20260120180000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120160000CS 20260120170000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120150000CS 20260120160000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120140000CS 20260120150000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120130000CS 20260120140000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120120000CS 20260120130000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120110000CS 20260120120000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120100000CS 20260120110000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120090000CS 20260120100000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120080000CS 20260120090000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120070000CS 20260120080000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120060000CS 20260120070000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120050000CS 20260120060000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120040000CS 20260120050000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120030000CS 20260120040000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120020000CS 20260120030000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120010000CS 20260120020000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120000000CS 20260120010000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119230000CS 20260120000000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119210000CS 20260119220000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119200000CS 20260119210000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119190000CS 20260119200000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119180000CS 20260119190000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119170000CS 20260119180000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119160000CS 20260119170000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119150000CS 20260119160000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119140000CS 20260119150000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119130000CS 20260119140000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119120000CS 20260119130000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119110000CS 20260119120000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119100000CS 20260119110000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119090000CS 20260119100000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119080000CS 20260119090000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119070000CS 20260119080000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119060000CS 20260119070000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119050000CS 20260119060000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119040000CS 20260119050000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119030000CS 20260119040000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119020000CS 20260119030000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119010000CS 20260119020000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119000000CS 20260119010000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260118230000CS 20260119000000CS 300 MW 20260119133952CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119210000CS 20260119220000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119200000CS 20260119210000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119190000CS 20260119200000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119180000CS 20260119190000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119170000CS 20260119180000CS 425 MW 20260119130556CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119160000CS 20260119170000CS 400 MW 20260119153528CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119150000CS 20260119160000CS 400 MW 20260119143808CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119140000CS 20260119150000CS 422 MW 20260119134756CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119130000CS 20260119140000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119120000CS 20260119130000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119110000CS 20260119120000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119100000CS 20260119110000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119090000CS 20260119100000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119080000CS 20260119090000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119070000CS 20260119080000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119060000CS 20260119070000CS 380 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119050000CS 20260119060000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119040000CS 20260119050000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119030000CS 20260119040000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119020000CS 20260119030000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119010000CS 20260119020000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119000000CS 20260119010000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118230000CS 20260119000000CS 350 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119210000CS 20260119220000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119200000CS 20260119210000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119190000CS 20260119200000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119180000CS 20260119190000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119170000CS 20260119180000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119160000CS 20260119170000CS 25 MW 20260119153528CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119150000CS 20260119160000CS 25 MW 20260119143808CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119140000CS 20260119150000CS 3 MW 20260119134756CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119130000CS 20260119140000CS 45 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119120000CS 20260119130000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119110000CS 20260119120000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119100000CS 20260119110000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119090000CS 20260119100000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119080000CS 20260119090000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119070000CS 20260119080000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119060000CS 20260119070000CS 270 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119050000CS 20260119060000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119040000CS 20260119050000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119030000CS 20260119040000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119020000CS 20260119030000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119010000CS 20260119020000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119000000CS 20260119010000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118230000CS 20260119000000CS 300 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118210000CS 20260118220000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118200000CS 20260118210000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118190000CS 20260118200000CS 355 MW 20260117122127CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118180000CS 20260118190000CS 355 MW 20260117122127CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118170000CS 20260118180000CS 400 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118160000CS 20260118170000CS 435 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118150000CS 20260118160000CS 435 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118140000CS 20260118150000CS 415 MW 20260118133900CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118130000CS 20260118140000CS 345 MW 20260117122127CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118120000CS 20260118130000CS 390 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118110000CS 20260118120000CS 390 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118100000CS 20260118110000CS 390 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118090000CS 20260118100000CS 390 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118080000CS 20260118090000CS 390 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118070000CS 20260118080000CS 360 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118060000CS 20260118070000CS 360 MW 20260117092054CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118050000CS 20260118060000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118040000CS 20260118050000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118030000CS 20260118040000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118020000CS 20260118030000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118010000CS 20260118020000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118000000CS 20260118010000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117230000CS 20260118000000CS 315 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118210000CS 20260118220000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118200000CS 20260118210000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118190000CS 20260118200000CS 290 MW 20260117122127CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118180000CS 20260118190000CS 290 MW 20260117122127CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118170000CS 20260118180000CS 242 MW 20260118164549CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118160000CS 20260118170000CS 205 MW 20260118153750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118150000CS 20260118160000CS 205 MW 20260118142619CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118140000CS 20260118150000CS 230 MW 20260118133900CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118130000CS 20260118140000CS 300 MW 20260117122127CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118120000CS 20260118130000CS 255 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118110000CS 20260118120000CS 255 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118100000CS 20260118110000CS 255 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118090000CS 20260118100000CS 255 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118080000CS 20260118090000CS 255 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118070000CS 20260118080000CS 285 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118060000CS 20260118070000CS 285 MW 20260117091929CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118050000CS 20260118060000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118040000CS 20260118050000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118030000CS 20260118040000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118020000CS 20260118030000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118010000CS 20260118020000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118000000CS 20260118010000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117230000CS 20260118000000CS 330 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117210000CS 20260117220000CS 315 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117200000CS 20260117210000CS 315 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117190000CS 20260117200000CS 315 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117180000CS 20260117190000CS 315 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117170000CS 20260117180000CS 375 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117160000CS 20260117170000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117150000CS 20260117160000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117140000CS 20260117150000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117130000CS 20260117140000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117120000CS 20260117130000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117110000CS 20260117120000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117100000CS 20260117110000CS 447 MW 20260117093408CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117090000CS 20260117100000CS 429 MW 20260117083640CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117080000CS 20260117090000CS 433 MW 20260117073547CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117070000CS 20260117080000CS 437 MW 20260117063843CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117060000CS 20260117070000CS 445 MW 20260117053717CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117050000CS 20260117060000CS 415 MW 20260116093443CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117040000CS 20260117050000CS 400 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117030000CS 20260117040000CS 390 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117020000CS 20260117030000CS 390 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117010000CS 20260117020000CS 390 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117000000CS 20260117010000CS 390 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116230000CS 20260117000000CS 390 MW 20260116192122CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117210000CS 20260117220000CS 330 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117200000CS 20260117210000CS 330 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117190000CS 20260117200000CS 330 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117180000CS 20260117190000CS 330 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117170000CS 20260117180000CS 270 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117160000CS 20260117170000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117150000CS 20260117160000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117140000CS 20260117150000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117130000CS 20260117140000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117120000CS 20260117130000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117110000CS 20260117120000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117100000CS 20260117110000CS 198 MW 20260117093408CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117090000CS 20260117100000CS 216 MW 20260117083640CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117080000CS 20260117090000CS 212 MW 20260117073547CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117070000CS 20260117080000CS 208 MW 20260117063843CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117060000CS 20260117070000CS 200 MW 20260117053717CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117050000CS 20260117060000CS 230 MW 20260116093347CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117040000CS 20260117050000CS 245 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117030000CS 20260117040000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117020000CS 20260117030000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117010000CS 20260117020000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117000000CS 20260117010000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116230000CS 20260117000000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116210000CS 20260116220000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116200000CS 20260116210000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116190000CS 20260116200000CS 255 MW 20260116155434CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116180000CS 20260116190000CS 255 MW 20260116155434CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116170000CS 20260116180000CS 255 MW 20260116155434CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116160000CS 20260116170000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116150000CS 20260116160000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116140000CS 20260116150000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116130000CS 20260116140000CS 300 MW 20260116113743CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116120000CS 20260116130000CS 300 MW 20260116110045CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116110000CS 20260116120000CS 309 MW 20260116065752CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116100000CS 20260116110000CS 309 MW 20260116065752CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116090000CS 20260116100000CS 309 MW 20260116065752CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116080000CS 20260116090000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116070000CS 20260116080000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116060000CS 20260116070000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116050000CS 20260116060000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116040000CS 20260116050000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116030000CS 20260116040000CS 300 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116020000CS 20260116030000CS 377 MW 20260115225750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116010000CS 20260116020000CS 377 MW 20260115225750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116000000CS 20260116010000CS 377 MW 20260115225750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260115230000CS 20260116000000CS 377 MW 20260115212422CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116210000CS 20260116220000CS 395 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116200000CS 20260116210000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116190000CS 20260116200000CS 395 MW 20260116155549CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116180000CS 20260116190000CS 395 MW 20260116155549CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116170000CS 20260116180000CS 395 MW 20260116155549CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116160000CS 20260116170000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116150000CS 20260116160000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116140000CS 20260116150000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116130000CS 20260116140000CS 341 MW 20260116102052CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116120000CS 20260116130000CS 341 MW 20260116102052CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116110000CS 20260116120000CS 341 MW 20260116065503CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116100000CS 20260116110000CS 341 MW 20260116065503CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116090000CS 20260116100000CS 341 MW 20260116065503CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116080000CS 20260116090000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116070000CS 20260116080000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116060000CS 20260116070000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116050000CS 20260116060000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116040000CS 20260116050000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116030000CS 20260116040000CS 350 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116020000CS 20260116030000CS 270 MW 20260115225133CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116010000CS 20260116020000CS 270 MW 20260115225133CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116000000CS 20260116010000CS 270 MW 20260115225133CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115230000CS 20260116000000CS 270 MW 20260115212021CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115210000CS 20260115220000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115200000CS 20260115210000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115190000CS 20260115200000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115180000CS 20260115190000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115170000CS 20260115180000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115160000CS 20260115170000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115150000CS 20260115160000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115140000CS 20260115150000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115130000CS 20260115140000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115120000CS 20260115130000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115110000CS 20260115120000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115100000CS 20260115110000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115090000CS 20260115100000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115080000CS 20260115090000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115070000CS 20260115080000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115060000CS 20260115070000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115050000CS 20260115060000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115040000CS 20260115050000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115030000CS 20260115040000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115020000CS 20260115030000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115010000CS 20260115020000CS 350 MW 20260115073504CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115000000CS 20260115010000CS 350 MW 20260115073504CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114230000CS 20260115000000CS 350 MW 20260115073504CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114210000CS 20260114220000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114200000CS 20260114210000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114190000CS 20260114200000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114180000CS 20260114190000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114170000CS 20260114180000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114160000CS 20260114170000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114150000CS 20260114160000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114140000CS 20260114150000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114130000CS 20260114140000CS 400 MW 20260114080116CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114120000CS 20260114130000CS 400 MW 20260114080116CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114110000CS 20260114120000CS 400 MW 20260114080116CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114100000CS 20260114110000CS 400 MW 20260114080116CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114090000CS 20260114100000CS 400 MW 20260114080116CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114080000CS 20260114090000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114070000CS 20260114080000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114060000CS 20260114070000CS 350 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114050000CS 20260114060000CS 350 MW 20260114023259CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114040000CS 20260114050000CS 350 MW 20260114023259CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114030000CS 20260114040000CS 350 MW 20260113233419CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114020000CS 20260114030000CS 350 MW 20260113233419CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114010000CS 20260114020000CS 350 MW 20260113233419CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114000000CS 20260114010000CS 425 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113230000CS 20260114000000CS 425 MW 20260113184844CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114210000CS 20260114220000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114200000CS 20260114210000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114190000CS 20260114200000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114180000CS 20260114190000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114170000CS 20260114180000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114160000CS 20260114170000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114150000CS 20260114160000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114140000CS 20260114150000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114130000CS 20260114140000CS 250 MW 20260114075959CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114120000CS 20260114130000CS 250 MW 20260114075959CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114110000CS 20260114120000CS 250 MW 20260114075959CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114100000CS 20260114110000CS 250 MW 20260114075959CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114090000CS 20260114100000CS 250 MW 20260114075959CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114080000CS 20260114090000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114070000CS 20260114080000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114060000CS 20260114070000CS 300 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114050000CS 20260114060000CS 300 MW 20260114023259CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114040000CS 20260114050000CS 300 MW 20260114023259CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114030000CS 20260114040000CS 300 MW 20260113233419CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114020000CS 20260114030000CS 300 MW 20260113233419CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114010000CS 20260114020000CS 300 MW 20260113233419CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114000000CS 20260114010000CS 225 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113230000CS 20260114000000CS 225 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113210000CS 20260113220000CS 258 MW 20260113190115CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113200000CS 20260113210000CS 266 MW 20260113185748CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113190000CS 20260113200000CS 246 MW 20260113182722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113180000CS 20260113190000CS 232 MW 20260113172839CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113170000CS 20260113180000CS 242 MW 20260113162727CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113160000CS 20260113170000CS 244 MW 20260113152727CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113150000CS 20260113160000CS 244 MW 20260113142722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113140000CS 20260113150000CS 240 MW 20260113132719CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113130000CS 20260113140000CS 194 MW 20260113122725CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113120000CS 20260113130000CS 172 MW 20260113112716CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113110000CS 20260113120000CS 173 MW 20260113102727CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113100000CS 20260113110000CS 178 MW 20260113092726CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113090000CS 20260113100000CS 190 MW 20260113064600CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113080000CS 20260113090000CS 180 MW 20260113064524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113070000CS 20260113080000CS 185 MW 20260113054940CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113060000CS 20260113070000CS 187 MW 20260113053403CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113050000CS 20260113060000CS 187 MW 20260113043554CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113040000CS 20260113050000CS 208 MW 20260113032730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113030000CS 20260113040000CS 208 MW 20260113022710CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113020000CS 20260113030000CS 199 MW 20260113012721CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113010000CS 20260113020000CS 210 MW 20260112225739CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113000000CS 20260113010000CS 255 MW 20260112224329CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112230000CS 20260113000000CS 300 MW 20260112211142CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112210000CS 20260112220000CS 395 MW 20260112184749CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112200000CS 20260112210000CS 450 MW 20260112184749CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112190000CS 20260112200000CS 450 MW 20260112174230CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112180000CS 20260112190000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112170000CS 20260112180000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112160000CS 20260112170000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112150000CS 20260112160000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112140000CS 20260112150000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112130000CS 20260112140000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112120000CS 20260112130000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112110000CS 20260112120000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112100000CS 20260112110000CS 329 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112090000CS 20260112100000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112080000CS 20260112090000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112070000CS 20260112080000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112060000CS 20260112070000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112050000CS 20260112060000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112040000CS 20260112050000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112030000CS 20260112040000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112020000CS 20260112030000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112010000CS 20260112020000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112000000CS 20260112010000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111230000CS 20260112000000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113210000CS 20260113220000CS 373 MW 20260113181717CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113200000CS 20260113210000CS 373 MW 20260113055114CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113190000CS 20260113200000CS 389 MW 20260113182722CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113180000CS 20260113190000CS 384 MW 20260113172839CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113170000CS 20260113180000CS 356 MW 20260113162727CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113160000CS 20260113170000CS 354 MW 20260113152727CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113150000CS 20260113160000CS 354 MW 20260113142722CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113140000CS 20260113150000CS 358 MW 20260113132719CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113130000CS 20260113140000CS 404 MW 20260113122725CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113120000CS 20260113130000CS 426 MW 20260113112716CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113110000CS 20260113120000CS 425 MW 20260113102727CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113100000CS 20260113110000CS 420 MW 20260113092726CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113090000CS 20260113100000CS 408 MW 20260113055114CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113080000CS 20260113090000CS 418 MW 20260113055114CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113070000CS 20260113080000CS 413 MW 20260113055114CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113060000CS 20260113070000CS 411 MW 20260113053403CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113050000CS 20260113060000CS 411 MW 20260113043554CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113040000CS 20260113050000CS 390 MW 20260113032730CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113030000CS 20260113040000CS 390 MW 20260113022710CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113020000CS 20260113030000CS 399 MW 20260113012721CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113010000CS 20260113020000CS 388 MW 20260112225854CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113000000CS 20260113010000CS 343 MW 20260112224444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112230000CS 20260113000000CS 298 MW 20260112081302CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111210000CS 20260111220000CS 314 MW 20260111181823CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111200000CS 20260111210000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111190000CS 20260111200000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111180000CS 20260111190000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111170000CS 20260111180000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111160000CS 20260111170000CS 341 MW 20260111133217CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111150000CS 20260111160000CS 341 MW 20260111132711CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111140000CS 20260111150000CS 341 MW 20260111113133CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111130000CS 20260111140000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111120000CS 20260111130000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111110000CS 20260111120000CS 337 MW 20260111081308CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111100000CS 20260111110000CS 337 MW 20260111081308CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111090000CS 20260111100000CS 345 MW 20260111062606CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111080000CS 20260111090000CS 345 MW 20260111062606CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111070000CS 20260111080000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111060000CS 20260111070000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111050000CS 20260111060000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111040000CS 20260111050000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111030000CS 20260111040000CS 350 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111020000CS 20260111030000CS 319 MW 20260110223310CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111010000CS 20260111020000CS 305 MW 20260110221609CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111000000CS 20260111010000CS 305 MW 20260110221609CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110230000CS 20260111000000CS 298 MW 20260110212700CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110210000CS 20260110220000CS 317 MW 20260110194746CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110200000CS 20260110210000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110190000CS 20260110200000CS 352 MW 20260110155549CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110180000CS 20260110190000CS 344 MW 20260110150127CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110170000CS 20260110180000CS 344 MW 20260110150127CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110160000CS 20260110170000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110150000CS 20260110160000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110140000CS 20260110150000CS 323 MW 20260110114115CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110130000CS 20260110140000CS 361 MW 20260110094507CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110120000CS 20260110130000CS 388 MW 20260110094507CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110110000CS 20260110120000CS 379 MW 20260110072917CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110100000CS 20260110110000CS 399 MW 20260110072917CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110090000CS 20260110100000CS 373 MW 20260110072442CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110080000CS 20260110090000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110070000CS 20260110080000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110060000CS 20260110070000CS 343 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110050000CS 20260110060000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110040000CS 20260110050000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110030000CS 20260110040000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110020000CS 20260110030000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110010000CS 20260110020000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110000000CS 20260110010000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109230000CS 20260110000000CS 300 MW 20260110044444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110210000CS 20260110220000CS 332 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110200000CS 20260110210000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110190000CS 20260110200000CS 296 MW 20260110155504CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110180000CS 20260110190000CS 296 MW 20260110145356CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110170000CS 20260110180000CS 296 MW 20260110145356CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110160000CS 20260110170000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110150000CS 20260110160000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110140000CS 20260110150000CS 326 MW 20260110114000CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110130000CS 20260110140000CS 286 MW 20260110094022CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110120000CS 20260110130000CS 258 MW 20260110094022CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110110000CS 20260110120000CS 267 MW 20260110071239CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110100000CS 20260110110000CS 247 MW 20260110071239CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110090000CS 20260110100000CS 274 MW 20260110071239CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110080000CS 20260110090000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110070000CS 20260110080000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110060000CS 20260110070000CS 305 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110050000CS 20260110060000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110040000CS 20260110050000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110030000CS 20260110040000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110020000CS 20260110030000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110010000CS 20260110020000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110000000CS 20260110010000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109230000CS 20260110000000CS 350 MW 20260110043612CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112210000CS 20260112220000CS 255 MW 20260112184625CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112200000CS 20260112210000CS 200 MW 20260112184625CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112190000CS 20260112200000CS 200 MW 20260112174055CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112180000CS 20260112190000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112170000CS 20260112180000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112160000CS 20260112170000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112150000CS 20260112160000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112140000CS 20260112150000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112130000CS 20260112140000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112120000CS 20260112130000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112110000CS 20260112120000CS 300 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112100000CS 20260112110000CS 320 MW 20260112085645CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112090000CS 20260112100000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112080000CS 20260112090000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112070000CS 20260112080000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112060000CS 20260112070000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112050000CS 20260112060000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112040000CS 20260112050000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112030000CS 20260112040000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112020000CS 20260112030000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112010000CS 20260112020000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112000000CS 20260112010000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111230000CS 20260112000000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111210000CS 20260111220000CS 109 MW 20260111183348CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111200000CS 20260111210000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111190000CS 20260111200000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111180000CS 20260111190000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111170000CS 20260111180000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111160000CS 20260111170000CS 84 MW 20260111133352CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111150000CS 20260111160000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111140000CS 20260111150000CS 84 MW 20260111113728CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111130000CS 20260111140000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111120000CS 20260111130000CS 75 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111110000CS 20260111120000CS 87 MW 20260111082203CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111100000CS 20260111110000CS 87 MW 20260111082203CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111090000CS 20260111100000CS 305 MW 20260111063216CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111080000CS 20260111090000CS 305 MW 20260111063216CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111070000CS 20260111080000CS 300 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111060000CS 20260111070000CS 300 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111050000CS 20260111060000CS 300 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111040000CS 20260111050000CS 300 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111030000CS 20260111040000CS 300 MW 20260110070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111020000CS 20260111030000CS 330 MW 20260110223425CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111010000CS 20260111020000CS 343 MW 20260110222015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111000000CS 20260111010000CS 343 MW 20260110222015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110230000CS 20260111000000CS 350 MW 20260110213118CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112210000CS 20260112220000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112200000CS 20260112210000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112190000CS 20260112200000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112180000CS 20260112190000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112170000CS 20260112180000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112160000CS 20260112170000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112150000CS 20260112160000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112140000CS 20260112150000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112130000CS 20260112140000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112120000CS 20260112130000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112110000CS 20260112120000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112100000CS 20260112110000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112090000CS 20260112100000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112080000CS 20260112090000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112070000CS 20260112080000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112060000CS 20260112070000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112050000CS 20260112060000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112040000CS 20260112050000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112030000CS 20260112040000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112020000CS 20260112030000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112010000CS 20260112020000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112000000CS 20260112010000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111230000CS 20260112000000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111210000CS 20260111220000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111200000CS 20260111210000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111190000CS 20260111200000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111180000CS 20260111190000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111170000CS 20260111180000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111160000CS 20260111170000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111150000CS 20260111160000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111140000CS 20260111150000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111130000CS 20260111140000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111120000CS 20260111130000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111110000CS 20260111120000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111100000CS 20260111110000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111090000CS 20260111100000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111080000CS 20260111090000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111070000CS 20260111080000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111060000CS 20260111070000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111050000CS 20260111060000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111040000CS 20260111050000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111030000CS 20260111040000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111020000CS 20260111030000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111010000CS 20260111020000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111000000CS 20260111010000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260110230000CS 20260111000000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112210000CS 20260112220000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112200000CS 20260112210000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112190000CS 20260112200000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112180000CS 20260112190000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112170000CS 20260112180000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112160000CS 20260112170000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112150000CS 20260112160000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112140000CS 20260112150000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112130000CS 20260112140000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112120000CS 20260112130000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112110000CS 20260112120000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112100000CS 20260112110000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112090000CS 20260112100000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112080000CS 20260112090000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112070000CS 20260112080000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112060000CS 20260112070000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112050000CS 20260112060000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112040000CS 20260112050000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112030000CS 20260112040000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112020000CS 20260112030000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112010000CS 20260112020000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112000000CS 20260112010000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111230000CS 20260112000000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111210000CS 20260111220000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111200000CS 20260111210000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111190000CS 20260111200000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111180000CS 20260111190000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111170000CS 20260111180000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111160000CS 20260111170000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111150000CS 20260111160000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111140000CS 20260111150000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111130000CS 20260111140000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111120000CS 20260111130000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111110000CS 20260111120000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111100000CS 20260111110000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111090000CS 20260111100000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111080000CS 20260111090000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111070000CS 20260111080000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111060000CS 20260111070000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111050000CS 20260111060000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111040000CS 20260111050000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111030000CS 20260111040000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111020000CS 20260111030000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111010000CS 20260111020000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111000000CS 20260111010000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260110230000CS 20260111000000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109210000CS 20260109220000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109200000CS 20260109210000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109190000CS 20260109200000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109180000CS 20260109190000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109170000CS 20260109180000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109160000CS 20260109170000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109150000CS 20260109160000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109140000CS 20260109150000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109130000CS 20260109140000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109120000CS 20260109130000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109110000CS 20260109120000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109100000CS 20260109110000CS 100 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109090000CS 20260109100000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109080000CS 20260109090000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109070000CS 20260109080000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109060000CS 20260109070000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109050000CS 20260109060000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109040000CS 20260109050000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109030000CS 20260109040000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109020000CS 20260109030000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109010000CS 20260109020000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109000000CS 20260109010000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108230000CS 20260109000000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109210000CS 20260109220000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109200000CS 20260109210000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109190000CS 20260109200000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109180000CS 20260109190000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109170000CS 20260109180000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109160000CS 20260109170000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109150000CS 20260109160000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109140000CS 20260109150000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109130000CS 20260109140000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109120000CS 20260109130000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109110000CS 20260109120000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109100000CS 20260109110000CS 300 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109090000CS 20260109100000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109080000CS 20260109090000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109070000CS 20260109080000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109060000CS 20260109070000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109050000CS 20260109060000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109040000CS 20260109050000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109030000CS 20260109040000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109020000CS 20260109030000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109010000CS 20260109020000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109000000CS 20260109010000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108230000CS 20260109000000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108210000CS 20260108220000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108200000CS 20260108210000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108190000CS 20260108200000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108180000CS 20260108190000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108170000CS 20260108180000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108160000CS 20260108170000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108150000CS 20260108160000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108140000CS 20260108150000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108130000CS 20260108140000CS 350 MW 20260108092100CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108120000CS 20260108130000CS 350 MW 20260108110046CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108110000CS 20260108120000CS 398 MW 20260108102717CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108100000CS 20260108110000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108090000CS 20260108100000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108080000CS 20260108090000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108070000CS 20260108080000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108060000CS 20260108070000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108050000CS 20260108060000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108040000CS 20260108050000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108030000CS 20260108040000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108020000CS 20260108030000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108010000CS 20260108020000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108000000CS 20260108010000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260107230000CS 20260108000000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109210000CS 20260109220000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109200000CS 20260109210000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109190000CS 20260109200000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109180000CS 20260109190000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109170000CS 20260109180000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109160000CS 20260109170000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109150000CS 20260109160000CS 380 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109140000CS 20260109150000CS 380 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109130000CS 20260109140000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109120000CS 20260109130000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109110000CS 20260109120000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109100000CS 20260109110000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109090000CS 20260109100000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109080000CS 20260109090000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109070000CS 20260109080000CS 380 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109060000CS 20260109070000CS 380 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109050000CS 20260109060000CS 380 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109040000CS 20260109050000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109030000CS 20260109040000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109020000CS 20260109030000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109010000CS 20260109020000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109000000CS 20260109010000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108230000CS 20260109000000CS 350 MW 20260108075448CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109210000CS 20260109220000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109200000CS 20260109210000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109190000CS 20260109200000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109180000CS 20260109190000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109170000CS 20260109180000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109160000CS 20260109170000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109150000CS 20260109160000CS 270 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109140000CS 20260109150000CS 270 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109130000CS 20260109140000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109120000CS 20260109130000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109110000CS 20260109120000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109100000CS 20260109110000CS 300 MW 20260108075334CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109090000CS 20260109100000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109080000CS 20260109090000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109070000CS 20260109080000CS 45 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109060000CS 20260109070000CS 45 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109050000CS 20260109060000CS 45 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109040000CS 20260109050000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109030000CS 20260109040000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109020000CS 20260109030000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109010000CS 20260109020000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109000000CS 20260109010000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108230000CS 20260109000000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108210000CS 20260108220000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108200000CS 20260108210000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108190000CS 20260108200000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108180000CS 20260108190000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108170000CS 20260108180000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108160000CS 20260108170000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108150000CS 20260108160000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108140000CS 20260108150000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108130000CS 20260108140000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108120000CS 20260108130000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108110000CS 20260108120000CS 27 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108100000CS 20260108110000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108090000CS 20260108100000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108080000CS 20260108090000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108070000CS 20260108080000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108060000CS 20260108070000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108050000CS 20260108060000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108040000CS 20260108050000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108030000CS 20260108040000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108020000CS 20260108030000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108010000CS 20260108020000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108000000CS 20260108010000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107230000CS 20260108000000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108210000CS 20260108220000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108200000CS 20260108210000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108190000CS 20260108200000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108180000CS 20260108190000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108170000CS 20260108180000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108160000CS 20260108170000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108150000CS 20260108160000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108140000CS 20260108150000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108130000CS 20260108140000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108120000CS 20260108130000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108110000CS 20260108120000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108100000CS 20260108110000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108090000CS 20260108100000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108080000CS 20260108090000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108070000CS 20260108080000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108060000CS 20260108070000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108050000CS 20260108060000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108040000CS 20260108050000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108030000CS 20260108040000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108020000CS 20260108030000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108010000CS 20260108020000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108000000CS 20260108010000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107230000CS 20260108000000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108210000CS 20260108220000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108200000CS 20260108210000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108190000CS 20260108200000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108180000CS 20260108190000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108170000CS 20260108180000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108160000CS 20260108170000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108150000CS 20260108160000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108140000CS 20260108150000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108130000CS 20260108140000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108120000CS 20260108130000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108110000CS 20260108120000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108100000CS 20260108110000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108090000CS 20260108100000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108080000CS 20260108090000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108070000CS 20260108080000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108060000CS 20260108070000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108050000CS 20260108060000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108040000CS 20260108050000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108030000CS 20260108040000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108020000CS 20260108030000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108010000CS 20260108020000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108000000CS 20260108010000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107230000CS 20260108000000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107210000CS 20260107220000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107200000CS 20260107210000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107190000CS 20260107200000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107180000CS 20260107190000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107170000CS 20260107180000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107160000CS 20260107170000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107150000CS 20260107160000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107140000CS 20260107150000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107130000CS 20260107140000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107120000CS 20260107130000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107110000CS 20260107120000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107100000CS 20260107110000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107090000CS 20260107100000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107080000CS 20260107090000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107070000CS 20260107080000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107060000CS 20260107070000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107050000CS 20260107060000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107040000CS 20260107050000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107030000CS 20260107040000CS 75 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107020000CS 20260107030000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107010000CS 20260107020000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107000000CS 20260107010000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106230000CS 20260107000000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107210000CS 20260107220000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107200000CS 20260107210000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107190000CS 20260107200000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107180000CS 20260107190000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107170000CS 20260107180000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107160000CS 20260107170000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107150000CS 20260107160000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107140000CS 20260107150000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107130000CS 20260107140000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107120000CS 20260107130000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107110000CS 20260107120000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107100000CS 20260107110000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107090000CS 20260107100000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107080000CS 20260107090000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107070000CS 20260107080000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107060000CS 20260107070000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107050000CS 20260107060000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107040000CS 20260107050000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107030000CS 20260107040000CS 0 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107020000CS 20260107030000CS 100 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107010000CS 20260107020000CS 100 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107000000CS 20260107010000CS 100 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260106230000CS 20260107000000CS 100 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107210000CS 20260107220000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107200000CS 20260107210000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107190000CS 20260107200000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107180000CS 20260107190000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107170000CS 20260107180000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107160000CS 20260107170000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107150000CS 20260107160000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107140000CS 20260107150000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107130000CS 20260107140000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107120000CS 20260107130000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107110000CS 20260107120000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107100000CS 20260107110000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107090000CS 20260107100000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107080000CS 20260107090000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107070000CS 20260107080000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107060000CS 20260107070000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107050000CS 20260107060000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107040000CS 20260107050000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107030000CS 20260107040000CS 75 MW Comments:potential transmission icing 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107020000CS 20260107030000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107010000CS 20260107020000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107000000CS 20260107010000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260106230000CS 20260107000000CS 300 MW 20260107065818CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106210000CS 20260106220000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106200000CS 20260106210000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106190000CS 20260106200000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106180000CS 20260106190000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106170000CS 20260106180000CS 395 MW 20260106154344CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106160000CS 20260106170000CS 425 MW 20260106153255CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106150000CS 20260106160000CS 412 MW 20260106143947CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106140000CS 20260106150000CS 434 MW 20260106132727CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106130000CS 20260106140000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106120000CS 20260106130000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106110000CS 20260106120000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106100000CS 20260106110000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106090000CS 20260106100000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106080000CS 20260106090000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106070000CS 20260106080000CS 416 MW 20260106063152CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106060000CS 20260106070000CS 403 MW 20260106053226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106050000CS 20260106060000CS 404 MW 20260106043406CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106040000CS 20260106050000CS 425 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106030000CS 20260106040000CS 380 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106020000CS 20260106030000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106010000CS 20260106020000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106000000CS 20260106010000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105230000CS 20260106000000CS 350 MW 20260105080813CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106210000CS 20260106220000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106200000CS 20260106210000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106190000CS 20260106200000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106180000CS 20260106190000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106170000CS 20260106180000CS 255 MW 20260106154229CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106160000CS 20260106170000CS 225 MW 20260106153255CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106150000CS 20260106160000CS 238 MW 20260106143947CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106140000CS 20260106150000CS 216 MW 20260106132727CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106130000CS 20260106140000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106120000CS 20260106130000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106110000CS 20260106120000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106100000CS 20260106110000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106090000CS 20260106100000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106080000CS 20260106090000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106070000CS 20260106080000CS 234 MW 20260106063152CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106060000CS 20260106070000CS 247 MW 20260106053226CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106050000CS 20260106060000CS 246 MW 20260106043406CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106040000CS 20260106050000CS 225 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106030000CS 20260106040000CS 270 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106020000CS 20260106030000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106010000CS 20260106020000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106000000CS 20260106010000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105230000CS 20260106000000CS 300 MW 20260105080659CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105210000CS 20260105220000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105200000CS 20260105210000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105190000CS 20260105200000CS 423 MW 20260105183210CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105180000CS 20260105190000CS 425 MW 20260105173312CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105170000CS 20260105180000CS 442 MW 20260105163351CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105160000CS 20260105170000CS 413 MW 20260105153351CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105150000CS 20260105160000CS 413 MW 20260105143301CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105140000CS 20260105150000CS 428 MW 20260105133222CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105130000CS 20260105140000CS 435 MW 20260105115138CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105120000CS 20260105130000CS 395 MW 20260104124444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105110000CS 20260105120000CS 395 MW 20260104124444CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105100000CS 20260105110000CS 445 MW 20260105090048CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105090000CS 20260105100000CS 445 MW 20260105080044CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105080000CS 20260105090000CS 440 MW 20260105065746CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105070000CS 20260105080000CS 445 MW 20260105063436CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105060000CS 20260105070000CS 435 MW 20260105053410CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105050000CS 20260105060000CS 470 MW 20260105021150CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105040000CS 20260105050000CS 400 MW 20260105011416CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105030000CS 20260105040000CS 375 MW 20260105011416CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105020000CS 20260105030000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105010000CS 20260105020000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105000000CS 20260105010000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104230000CS 20260105000000CS 350 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105210000CS 20260105220000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105200000CS 20260105210000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105190000CS 20260105200000CS 227 MW 20260105183210CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105180000CS 20260105190000CS 225 MW 20260105173312CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105170000CS 20260105180000CS 208 MW 20260105163351CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105160000CS 20260105170000CS 237 MW 20260105153351CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105150000CS 20260105160000CS 237 MW 20260105143301CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105140000CS 20260105150000CS 222 MW 20260105133222CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105130000CS 20260105140000CS 215 MW 20260105115044CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105120000CS 20260105130000CS 255 MW 20260104124340CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105110000CS 20260105120000CS 255 MW 20260104124340CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105100000CS 20260105110000CS 205 MW 20260105090048CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105090000CS 20260105100000CS 205 MW 20260105080044CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105080000CS 20260105090000CS 210 MW 20260105065622CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105070000CS 20260105080000CS 205 MW 20260105063436CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105060000CS 20260105070000CS 215 MW 20260105053410CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105050000CS 20260105060000CS 180 MW 20260105021036CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105040000CS 20260105050000CS 250 MW 20260105011301CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105030000CS 20260105040000CS 275 MW 20260105011301CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105020000CS 20260105030000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105010000CS 20260105020000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105000000CS 20260105010000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104230000CS 20260105000000CS 300 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104210000CS 20260104220000CS 425 MW 20260104171547CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104200000CS 20260104210000CS 425 MW 20260104171547CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104190000CS 20260104200000CS 410 MW 20260104150914CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104180000CS 20260104190000CS 410 MW 20260104150914CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104170000CS 20260104180000CS 405 MW 20260104150914CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104160000CS 20260104170000CS 406 MW 20260104153210CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104150000CS 20260104160000CS 399 MW 20260104143152CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104140000CS 20260104150000CS 398 MW 20260104133723CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104130000CS 20260104140000CS 423 MW 20260104123633CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104120000CS 20260104130000CS 417 MW 20260104114241CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104110000CS 20260104120000CS 425 MW 20260104074516CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104100000CS 20260104110000CS 425 MW 20260104074516CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104090000CS 20260104100000CS 406 MW 20260104083416CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104080000CS 20260104090000CS 405 MW 20260104073817CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104070000CS 20260104080000CS 402 MW 20260104063648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104060000CS 20260104070000CS 425 MW 20260103185041CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104050000CS 20260104060000CS 425 MW 20260103185041CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104040000CS 20260104050000CS 400 MW 20260103185041CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104030000CS 20260104040000CS 400 MW 20260103185041CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104020000CS 20260104030000CS 350 MW 20260103070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104010000CS 20260104020000CS 350 MW 20260103070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104000000CS 20260104010000CS 350 MW 20260103070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103230000CS 20260104000000CS 350 MW 20260103070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104210000CS 20260104220000CS 225 MW 20260104171432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104200000CS 20260104210000CS 225 MW 20260104171432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104190000CS 20260104200000CS 240 MW 20260104150750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104180000CS 20260104190000CS 240 MW 20260104150750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104170000CS 20260104180000CS 245 MW 20260104150750CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104160000CS 20260104170000CS 244 MW 20260104153210CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104150000CS 20260104160000CS 251 MW 20260104143152CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104140000CS 20260104150000CS 252 MW 20260104133723CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104130000CS 20260104140000CS 227 MW 20260104123633CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104120000CS 20260104130000CS 233 MW 20260104114241CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104110000CS 20260104120000CS 225 MW 20260104074342CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104100000CS 20260104110000CS 225 MW 20260104074342CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104090000CS 20260104100000CS 244 MW 20260104083416CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104080000CS 20260104090000CS 245 MW 20260104073817CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104070000CS 20260104080000CS 248 MW 20260104063648CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104060000CS 20260104070000CS 225 MW 20260103184936CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104050000CS 20260104060000CS 225 MW 20260103184936CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104040000CS 20260104050000CS 250 MW 20260103184936CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104030000CS 20260104040000CS 250 MW 20260103184936CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104020000CS 20260104030000CS 300 MW 20260103070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104010000CS 20260104020000CS 300 MW 20260103070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104000000CS 20260104010000CS 300 MW 20260103070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103230000CS 20260104000000CS 300 MW 20260103070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103210000CS 20260103220000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103200000CS 20260103210000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103190000CS 20260103200000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103180000CS 20260103190000CS 395 MW 20260103155524CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103170000CS 20260103180000CS 395 MW 20260103151354CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103160000CS 20260103170000CS 395 MW 20260103125251CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103150000CS 20260103160000CS 395 MW 20260103125251CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103140000CS 20260103150000CS 395 MW 20260103125251CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103130000CS 20260103140000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103120000CS 20260103130000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103110000CS 20260103120000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103100000CS 20260103110000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103090000CS 20260103100000CS 380 MW 20260103043152CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103080000CS 20260103090000CS 380 MW 20260103043152CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103070000CS 20260103080000CS 410 MW 20260103043152CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103060000CS 20260103070000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103050000CS 20260103060000CS 395 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103040000CS 20260103050000CS 395 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103030000CS 20260103040000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103020000CS 20260103030000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103010000CS 20260103020000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103000000CS 20260103010000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102230000CS 20260103000000CS 350 MW 20260103025423CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103210000CS 20260103220000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103200000CS 20260103210000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103190000CS 20260103200000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103180000CS 20260103190000CS 255 MW 20260103155340CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103170000CS 20260103180000CS 255 MW 20260103151229CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103160000CS 20260103170000CS 255 MW 20260103125117CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103150000CS 20260103160000CS 255 MW 20260103125117CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103140000CS 20260103150000CS 255 MW 20260103125117CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103130000CS 20260103140000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103120000CS 20260103130000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103110000CS 20260103120000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103100000CS 20260103110000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103090000CS 20260103100000CS 270 MW 20260103043037CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103080000CS 20260103090000CS 270 MW 20260103043037CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103070000CS 20260103080000CS 240 MW 20260103043037CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103060000CS 20260103070000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103050000CS 20260103060000CS 255 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103040000CS 20260103050000CS 255 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103030000CS 20260103040000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103020000CS 20260103030000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103010000CS 20260103020000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103000000CS 20260103010000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102230000CS 20260103000000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102210000CS 20260102220000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102200000CS 20260102210000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102190000CS 20260102200000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102180000CS 20260102190000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102170000CS 20260102180000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102160000CS 20260102170000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102150000CS 20260102160000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102140000CS 20260102150000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102130000CS 20260102140000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102120000CS 20260102130000CS 356 MW 20260102092313CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102110000CS 20260102120000CS 322 MW 20260102092313CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102100000CS 20260102110000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102090000CS 20260102100000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102080000CS 20260102090000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102070000CS 20260102080000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102060000CS 20260102070000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102050000CS 20260102060000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102040000CS 20260102050000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102030000CS 20260102040000CS 300 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102020000CS 20260102030000CS 344 MW 20260101212215CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102010000CS 20260102020000CS 373 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102000000CS 20260102010000CS 373 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101230000CS 20260102000000CS 373 MW 20260101194323CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102210000CS 20260102220000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102200000CS 20260102210000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102190000CS 20260102200000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102180000CS 20260102190000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102170000CS 20260102180000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102160000CS 20260102170000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102150000CS 20260102160000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102140000CS 20260102150000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102130000CS 20260102140000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102120000CS 20260102130000CS 291 MW 20260102091014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102110000CS 20260102120000CS 327 MW 20260102091014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102100000CS 20260102110000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102090000CS 20260102100000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102080000CS 20260102090000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102070000CS 20260102080000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102060000CS 20260102070000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102050000CS 20260102060000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102040000CS 20260102050000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102030000CS 20260102040000CS 350 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102020000CS 20260102030000CS 304 MW 20260101212006CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102010000CS 20260102020000CS 274 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102000000CS 20260102010000CS 274 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101230000CS 20260102000000CS 274 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101210000CS 20260101220000CS 245 MW 20260101185234CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101200000CS 20260101210000CS 184 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101190000CS 20260101200000CS 264 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101180000CS 20260101190000CS 273 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101170000CS 20260101180000CS 282 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101160000CS 20260101170000CS 300 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101150000CS 20260101160000CS 318 MW 20260101093607CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101140000CS 20260101150000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101130000CS 20260101140000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101120000CS 20260101130000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101110000CS 20260101120000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101100000CS 20260101110000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101090000CS 20260101100000CS 350 MW 20251231203532CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101080000CS 20260101090000CS 400 MW 20260101051849CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101070000CS 20260101080000CS 400 MW 20260101051849CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101060000CS 20260101070000CS 395 MW 20260101034621CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101050000CS 20260101060000CS 395 MW 20260101034621CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101040000CS 20260101050000CS 401 MW 20260101032721CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101030000CS 20260101040000CS 419 MW 20260101022722CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101020000CS 20260101030000CS 376 MW 20260101012723CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101010000CS 20260101020000CS 416 MW 20260101002710CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101000000CS 20260101010000CS 425 MW 20251231203532CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101210000CS 20260101220000CS 400 MW 20260101185554CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101200000CS 20260101210000CS 459 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101190000CS 20260101200000CS 382 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101180000CS 20260101190000CS 374 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101170000CS 20260101180000CS 365 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101160000CS 20260101170000CS 348 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101150000CS 20260101160000CS 331 MW 20260101094924CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101140000CS 20260101150000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101130000CS 20260101140000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101120000CS 20260101130000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101110000CS 20260101120000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101100000CS 20260101110000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101090000CS 20260101100000CS 300 MW 20251231203407CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101080000CS 20260101090000CS 250 MW 20260101051745CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101070000CS 20260101080000CS 250 MW 20260101051745CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101060000CS 20260101070000CS 255 MW 20260101034447CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101050000CS 20260101060000CS 255 MW 20260101034447CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101040000CS 20260101050000CS 249 MW 20260101032721CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101030000CS 20260101040000CS 231 MW 20260101022722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101020000CS 20260101030000CS 274 MW 20260101012723CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101010000CS 20260101020000CS 234 MW 20260101002710CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101000000CS 20260101010000CS 225 MW 20251231203407CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260102220000CS 20260103220000CS 350 MW 20251225070014CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260102220000CS 20260103220000CS 300 MW 20251225070014CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260130220000CS 20260131220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260129220000CS 20260130220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260128220000CS 20260129220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260127220000CS 20260128220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260126220000CS 20260127220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260125220000CS 20260126220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260124220000CS 20260125220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260123220000CS 20260124220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260122220000CS 20260123220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260121220000CS 20260122220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260120220000CS 20260121220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260119220000CS 20260120220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260118220000CS 20260119220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260117220000CS 20260118220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260116220000CS 20260117220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260115220000CS 20260116220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260114220000CS 20260115220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260113220000CS 20260114220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260112220000CS 20260113220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260111220000CS 20260112220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260110220000CS 20260111220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260109220000CS 20260110220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260108220000CS 20260109220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260107220000CS 20260108220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260106220000CS 20260107220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260105220000CS 20260106220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260104220000CS 20260105220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260103220000CS 20260104220000CS 350 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260101220000CS 20260102220000CS 350 MW 20251225070014CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260130220000CS 20260131220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260129220000CS 20260130220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260128220000CS 20260129220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260127220000CS 20260128220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260126220000CS 20260127220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260125220000CS 20260126220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260124220000CS 20260125220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260123220000CS 20260124220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260122220000CS 20260123220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260121220000CS 20260122220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260120220000CS 20260121220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260119220000CS 20260119230000CS 75 MW Comments:potential icing 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260118220000CS 20260118230000CS 300 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260117220000CS 20260118220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260116220000CS 20260117220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260115220000CS 20260116220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260114220000CS 20260115220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260113220000CS 20260114220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260112220000CS 20260113220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260111220000CS 20260111230000CS 75 MW Comments:expected transmission icing 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260110220000CS 20260110230000CS 300 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260109220000CS 20260110220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260108220000CS 20260108230000CS 75 MW Comments:potential transmission icing 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260107220000CS 20260107230000CS 75 MW Comments:potential transmission icing 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260106220000CS 20260106230000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260105220000CS 20260106220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260104220000CS 20260105220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260103220000CS 20260104220000CS 300 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260101220000CS 20260102220000CS 300 MW 20251225070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260130220000CS 20260130230000CS 350 MW 20260130092232CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260129220000CS 20260129230000CS 350 MW 20260129081648CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260128220000CS 20260128230000CS 350 MW 20260128081846CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260127220000CS 20260127230000CS 350 MW 20260127092526CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260126220000CS 20260127220000CS 350 MW 20251222121706CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260125220000CS 20260125230000CS 350 MW 20260125070015CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260124220000CS 20260124230000CS 533 MW 20260124213401CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260123220000CS 20260123230000CS 527 MW 20260123190949CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260122220000CS 20260122230000CS 496 MW 20260122202319CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260121220000CS 20260121230000CS 465 MW 20260121213242CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260120220000CS 20260120230000CS 350 MW 20260120090256CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260119220000CS 20260119230000CS 350 MW 20260120135645CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260118220000CS 20260118230000CS 350 MW 20260118070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260117220000CS 20260117230000CS 315 MW 20260117070020CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260116220000CS 20260116230000CS 390 MW 20260116192122CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260115220000CS 20260115230000CS 270 MW 20260115203430CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260114220000CS 20260114230000CS 350 MW 20260114212445CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260113220000CS 20260113230000CS 425 MW 20260113184844CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260112220000CS 20260112230000CS 350 MW 20260112081302CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260111220000CS 20260111230000CS 350 MW 20260112085226CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260110220000CS 20260110230000CS 332 MW 20260110193751CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260109220000CS 20260109230000CS 350 MW 20260110043612CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260108220000CS 20260108230000CS 350 MW 20260108075448CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260107220000CS 20260107230000CS 350 MW 20260108092026CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260106220000CS 20260107220000CS 350 MW 20251222121706CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260105220000CS 20260105230000CS 350 MW 20260105080813CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260104220000CS 20260104230000CS 350 MW 20260104070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260103220000CS 20260103230000CS 350 MW 20260103070014CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260102220000CS 20260102230000CS 350 MW 20260103025423CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260101220000CS 20260101230000CS 274 MW 20260101194042CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260130220000CS 20260131220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260129220000CS 20260130220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260128220000CS 20260129220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260127220000CS 20260128220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260126220000CS 20260127220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260125220000CS 20260126220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260124220000CS 20260125220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260123220000CS 20260124220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260122220000CS 20260123220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260121220000CS 20260122220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260120220000CS 20260121220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260119220000CS 20260120220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260118220000CS 20260119220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260117220000CS 20260118220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260116220000CS 20260117220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260115220000CS 20260116220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260114220000CS 20260115220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260113220000CS 20260114220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260112220000CS 20260113220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260111220000CS 20260112220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260110220000CS 20260111220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260109220000CS 20260110220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260108220000CS 20260109220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260107220000CS 20260108220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260106220000CS 20260107220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260105220000CS 20260106220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260104220000CS 20260105220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260103220000CS 20260104220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260102220000CS 20260103220000CS 350 MW 20251202060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260101220000CS 20260102220000CS 350 MW 20251202060012CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260130220000CS 20260130230000CS 300 MW 20260130092108CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260129220000CS 20260129230000CS 300 MW 20260129081524CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260128220000CS 20260128230000CS 300 MW 20260128081722CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260127220000CS 20260127230000CS 300 MW 20260127092422CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260126220000CS 20260127220000CS 300 MW 20260126070011CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260125220000CS 20260125230000CS 300 MW 20260125070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260124220000CS 20260124230000CS 98 MW 20260124205339CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260123220000CS 20260123230000CS 123 MW 20260123185946CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260122220000CS 20260122230000CS 154 MW 20260122201730CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260121220000CS 20260121230000CS 139 MW 20260121213242CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260120220000CS 20260120230000CS 300 MW 20260120090131CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260119220000CS 20260119230000CS 75 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260118220000CS 20260118230000CS 300 MW 20260118070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260117220000CS 20260117230000CS 330 MW 20260117070020CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260116220000CS 20260116230000CS 255 MW 20260116192017CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260115220000CS 20260115230000CS 377 MW 20260115204019CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260114220000CS 20260115220000CS 300 MW 20260114070010CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260113220000CS 20260113230000CS 225 MW 20260113184729CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260112220000CS 20260112230000CS 300 MW 20260112092615CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260111220000CS 20260111230000CS 75 MW 20260111070015CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260110220000CS 20260110230000CS 317 MW 20260110194746CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260109220000CS 20260109230000CS 300 MW 20260110044444CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260108220000CS 20260108230000CS 75 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260107220000CS 20260107230000CS 75 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260106220000CS 20260106230000CS 300 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260105220000CS 20260105230000CS 300 MW 20260105080659CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260104220000CS 20260104230000CS 300 MW 20260104070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260103220000CS 20260103230000CS 300 MW 20260103070014CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260102220000CS 20260102230000CS 300 MW 20260103025248CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260101220000CS 20260101230000CS 373 MW 20260101194323CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260130220000CS 20260131220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260129220000CS 20260130220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260128220000CS 20260129220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260127220000CS 20260128220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260126220000CS 20260127220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260125220000CS 20260126220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260124220000CS 20260125220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260123220000CS 20260124220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260122220000CS 20260123220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260121220000CS 20260122220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260120220000CS 20260121220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260119220000CS 20260119230000CS 0 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260118220000CS 20260118230000CS 100 MW 20260119133952CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260117220000CS 20260118220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260116220000CS 20260117220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260115220000CS 20260116220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260114220000CS 20260115220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260113220000CS 20260114220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260112220000CS 20260113220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260111220000CS 20260111230000CS 0 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260110220000CS 20260110230000CS 100 MW 20260109093724CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260109220000CS 20260110220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260108220000CS 20260108230000CS 0 MW 20260109071608CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260107220000CS 20260107230000CS 0 MW 20260107130432CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260106220000CS 20260106230000CS 100 MW 20260107065818CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260105220000CS 20260106220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260104220000CS 20260105220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260103220000CS 20260104220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260102220000CS 20260103220000CS 100 MW 20251231113615CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260101220000CS 20260102220000CS 100 MW 20251231113615CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 20260131220000CS 20260131230000CS 395 MW 20260131195420CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 20260131220000CS 20260131230000CS 255 MW 20260131195345CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20260131220000CS 20260201220000CS 350 MW 20260102060012CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 20251231220000CS 20260101220000CS 350 MW 20251202060012CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20260131220000CS 20260201220000CS 100 MW 20260129130018CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 20251231220000CS 20260101220000CS 100 MW 20251231113615CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20260131220000CS 20260201220000CS 350 MW 20260124070013CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 20251231220000CS 20260101220000CS 350 MW 20251224070018CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20260131220000CS 20260201220000CS 300 MW 20260124070013CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 20251231220000CS 20260101220000CS 300 MW 20251224070018CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 23:00:00 CS 2026-03-01 00:00:00 CS 319 MW 2026-02-28 09:13:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 23:00:00 CS 2026-03-01 00:00:00 CS 330 MW 2026-02-28 09:13:07 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 21:00:00 CS 2026-02-28 22:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 20:00:00 CS 2026-02-28 21:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 19:00:00 CS 2026-02-28 20:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 18:00:00 CS 2026-02-28 19:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 17:00:00 CS 2026-02-28 18:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 16:00:00 CS 2026-02-28 17:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 15:00:00 CS 2026-02-28 16:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 14:00:00 CS 2026-02-28 15:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 13:00:00 CS 2026-02-28 14:00:00 CS 334 MW 2026-02-28 09:29:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 12:00:00 CS 2026-02-28 13:00:00 CS 334 MW 2026-02-28 10:58:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 11:00:00 CS 2026-02-28 12:00:00 CS 334 MW 2026-02-28 09:51:54 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 10:00:00 CS 2026-02-28 11:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 09:00:00 CS 2026-02-28 10:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 08:00:00 CS 2026-02-28 09:00:00 CS 364 MW 2026-02-28 05:24:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 07:00:00 CS 2026-02-28 08:00:00 CS 439 MW 2026-02-28 04:14:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 06:00:00 CS 2026-02-28 07:00:00 CS 439 MW 2026-02-28 04:14:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 05:00:00 CS 2026-02-28 06:00:00 CS 439 MW 2026-02-28 02:45:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 04:00:00 CS 2026-02-28 05:00:00 CS 439 MW 2026-02-28 02:45:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 03:00:00 CS 2026-02-28 04:00:00 CS 409 MW 2026-02-27 22:57:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 02:00:00 CS 2026-02-28 03:00:00 CS 409 MW 2026-02-27 22:57:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 01:00:00 CS 2026-02-28 02:00:00 CS 409 MW 2026-02-27 22:57:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 00:00:00 CS 2026-02-28 01:00:00 CS 409 MW 2026-02-27 22:57:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 23:00:00 CS 2026-02-28 00:00:00 CS 364 MW 2026-02-27 21:42:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 21:00:00 CS 2026-02-28 22:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 20:00:00 CS 2026-02-28 21:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 19:00:00 CS 2026-02-28 20:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 18:00:00 CS 2026-02-28 19:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 17:00:00 CS 2026-02-28 18:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 16:00:00 CS 2026-02-28 17:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 15:00:00 CS 2026-02-28 16:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 14:00:00 CS 2026-02-28 15:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 13:00:00 CS 2026-02-28 14:00:00 CS 315 MW 2026-02-28 09:28:03 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 12:00:00 CS 2026-02-28 13:00:00 CS 315 MW 2026-02-28 10:58:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 11:00:00 CS 2026-02-28 12:00:00 CS 315 MW 2026-02-28 09:51:54 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 10:00:00 CS 2026-02-28 11:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 09:00:00 CS 2026-02-28 10:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 08:00:00 CS 2026-02-28 09:00:00 CS 285 MW 2026-02-28 05:23:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 07:00:00 CS 2026-02-28 08:00:00 CS 180 MW 2026-02-28 04:12:44 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 06:00:00 CS 2026-02-28 07:00:00 CS 180 MW 2026-02-28 04:12:44 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 05:00:00 CS 2026-02-28 06:00:00 CS 180 MW 2026-02-28 02:44:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 04:00:00 CS 2026-02-28 05:00:00 CS 180 MW 2026-02-28 02:44:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 03:00:00 CS 2026-02-28 04:00:00 CS 210 MW 2026-02-27 22:55:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 02:00:00 CS 2026-02-28 03:00:00 CS 240 MW 2026-02-27 22:55:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 01:00:00 CS 2026-02-28 02:00:00 CS 240 MW 2026-02-27 22:55:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 00:00:00 CS 2026-02-28 01:00:00 CS 240 MW 2026-02-27 22:55:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 23:00:00 CS 2026-02-28 00:00:00 CS 285 MW 2026-02-27 21:40:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 21:00:00 CS 2026-02-26 22:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 20:00:00 CS 2026-02-26 21:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 19:00:00 CS 2026-02-26 20:00:00 CS 309 MW 2026-02-26 17:38:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 18:00:00 CS 2026-02-26 19:00:00 CS 309 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 17:00:00 CS 2026-02-26 18:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 16:00:00 CS 2026-02-26 17:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 15:00:00 CS 2026-02-26 16:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 14:00:00 CS 2026-02-26 15:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 13:00:00 CS 2026-02-26 14:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 12:00:00 CS 2026-02-26 13:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 11:00:00 CS 2026-02-26 12:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 10:00:00 CS 2026-02-26 11:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 09:00:00 CS 2026-02-26 10:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 08:00:00 CS 2026-02-26 09:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 07:00:00 CS 2026-02-26 08:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 06:00:00 CS 2026-02-26 07:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 05:00:00 CS 2026-02-26 06:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 04:00:00 CS 2026-02-26 05:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 03:00:00 CS 2026-02-26 04:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 02:00:00 CS 2026-02-26 03:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 01:00:00 CS 2026-02-26 02:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 00:00:00 CS 2026-02-26 01:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 23:00:00 CS 2026-02-26 00:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 21:00:00 CS 2026-02-26 22:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 20:00:00 CS 2026-02-26 21:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 19:00:00 CS 2026-02-26 20:00:00 CS 341 MW 2026-02-26 17:32:01 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 18:00:00 CS 2026-02-26 19:00:00 CS 341 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 17:00:00 CS 2026-02-26 18:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 16:00:00 CS 2026-02-26 17:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 15:00:00 CS 2026-02-26 16:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 14:00:00 CS 2026-02-26 15:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 13:00:00 CS 2026-02-26 14:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 12:00:00 CS 2026-02-26 13:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 11:00:00 CS 2026-02-26 12:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 10:00:00 CS 2026-02-26 11:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 09:00:00 CS 2026-02-26 10:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 08:00:00 CS 2026-02-26 09:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 07:00:00 CS 2026-02-26 08:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 06:00:00 CS 2026-02-26 07:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 05:00:00 CS 2026-02-26 06:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 04:00:00 CS 2026-02-26 05:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 03:00:00 CS 2026-02-26 04:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 02:00:00 CS 2026-02-26 03:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 01:00:00 CS 2026-02-26 02:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 00:00:00 CS 2026-02-26 01:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 23:00:00 CS 2026-02-26 00:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 21:00:00 CS 2026-02-27 22:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 20:00:00 CS 2026-02-27 21:00:00 CS 275 MW 2026-02-27 13:39:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 19:00:00 CS 2026-02-27 20:00:00 CS 223 MW 2026-02-27 18:27:31 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 18:00:00 CS 2026-02-27 19:00:00 CS 200 MW 2026-02-27 13:39:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 17:00:00 CS 2026-02-27 18:00:00 CS 166 MW 2026-02-27 16:47:34 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 16:00:00 CS 2026-02-27 17:00:00 CS 176 MW 2026-02-27 15:40:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 15:00:00 CS 2026-02-27 16:00:00 CS 150 MW 2026-02-27 14:18:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 14:00:00 CS 2026-02-27 15:00:00 CS 150 MW 2026-02-27 13:31:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 13:00:00 CS 2026-02-27 14:00:00 CS 150 MW 2026-02-27 12:21:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 12:00:00 CS 2026-02-27 13:00:00 CS 150 MW 2026-02-27 11:30:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 11:00:00 CS 2026-02-27 12:00:00 CS 150 MW 2026-02-27 10:29:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 10:00:00 CS 2026-02-27 11:00:00 CS 150 MW 2026-02-27 09:27:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 09:00:00 CS 2026-02-27 10:00:00 CS 225 MW 2026-02-27 08:29:39 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 08:00:00 CS 2026-02-27 09:00:00 CS 300 MW 2026-02-27 08:05:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 07:00:00 CS 2026-02-27 08:00:00 CS 305 MW 2026-02-27 02:48:35 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 06:00:00 CS 2026-02-27 07:00:00 CS 305 MW 2026-02-27 02:48:35 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 05:00:00 CS 2026-02-27 06:00:00 CS 305 MW 2026-02-27 02:48:35 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 04:00:00 CS 2026-02-27 05:00:00 CS 255 MW 2026-02-27 02:48:35 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 03:00:00 CS 2026-02-27 04:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 02:00:00 CS 2026-02-27 03:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 01:00:00 CS 2026-02-27 02:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 00:00:00 CS 2026-02-27 01:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 23:00:00 CS 2026-02-27 00:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 21:00:00 CS 2026-02-27 22:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 20:00:00 CS 2026-02-27 21:00:00 CS 373 MW 2026-02-27 13:40:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 19:00:00 CS 2026-02-27 20:00:00 CS 425 MW 2026-02-27 18:27:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 18:00:00 CS 2026-02-27 19:00:00 CS 448 MW 2026-02-27 13:40:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 17:00:00 CS 2026-02-27 18:00:00 CS 432 MW 2026-02-27 16:47:34 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 16:00:00 CS 2026-02-27 17:00:00 CS 422 MW 2026-02-27 15:40:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 15:00:00 CS 2026-02-27 16:00:00 CS 448 MW 2026-02-27 13:40:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 14:00:00 CS 2026-02-27 15:00:00 CS 448 MW 2026-02-27 12:40:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 13:00:00 CS 2026-02-27 14:00:00 CS 448 MW 2026-02-27 10:36:00 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 12:00:00 CS 2026-02-27 13:00:00 CS 448 MW 2026-02-27 10:36:00 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 11:00:00 CS 2026-02-27 12:00:00 CS 448 MW 2026-02-27 08:40:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 10:00:00 CS 2026-02-27 11:00:00 CS 448 MW 2026-02-27 08:40:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 09:00:00 CS 2026-02-27 10:00:00 CS 373 MW 2026-02-27 07:54:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 08:00:00 CS 2026-02-27 09:00:00 CS 298 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 07:00:00 CS 2026-02-27 08:00:00 CS 343 MW 2026-02-27 02:49:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 06:00:00 CS 2026-02-27 07:00:00 CS 343 MW 2026-02-27 02:49:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 05:00:00 CS 2026-02-27 06:00:00 CS 343 MW 2026-02-27 02:49:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 04:00:00 CS 2026-02-27 05:00:00 CS 395 MW 2026-02-27 02:49:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 03:00:00 CS 2026-02-27 04:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 02:00:00 CS 2026-02-27 03:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 01:00:00 CS 2026-02-27 02:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 00:00:00 CS 2026-02-27 01:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 23:00:00 CS 2026-02-27 00:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 21:00:00 CS 2026-02-25 22:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 20:00:00 CS 2026-02-25 21:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 19:00:00 CS 2026-02-25 20:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 18:00:00 CS 2026-02-25 19:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 17:00:00 CS 2026-02-25 18:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 16:00:00 CS 2026-02-25 17:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 15:00:00 CS 2026-02-25 16:00:00 CS 100 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 14:00:00 CS 2026-02-25 15:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 13:00:00 CS 2026-02-25 14:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 12:00:00 CS 2026-02-25 13:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 11:00:00 CS 2026-02-25 12:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 10:00:00 CS 2026-02-25 11:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 09:00:00 CS 2026-02-25 10:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 08:00:00 CS 2026-02-25 09:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 07:00:00 CS 2026-02-25 08:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 06:00:00 CS 2026-02-25 07:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 05:00:00 CS 2026-02-25 06:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 04:00:00 CS 2026-02-25 05:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 03:00:00 CS 2026-02-25 04:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 02:00:00 CS 2026-02-25 03:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 01:00:00 CS 2026-02-25 02:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 00:00:00 CS 2026-02-25 01:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 23:00:00 CS 2026-02-25 00:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 21:00:00 CS 2026-02-25 22:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 20:00:00 CS 2026-02-25 21:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 19:00:00 CS 2026-02-25 20:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 18:00:00 CS 2026-02-25 19:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 17:00:00 CS 2026-02-25 18:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 16:00:00 CS 2026-02-25 17:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 15:00:00 CS 2026-02-25 16:00:00 CS 300 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 14:00:00 CS 2026-02-25 15:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 13:00:00 CS 2026-02-25 14:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 12:00:00 CS 2026-02-25 13:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 11:00:00 CS 2026-02-25 12:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 10:00:00 CS 2026-02-25 11:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 09:00:00 CS 2026-02-25 10:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 08:00:00 CS 2026-02-25 09:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 07:00:00 CS 2026-02-25 08:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 06:00:00 CS 2026-02-25 07:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 05:00:00 CS 2026-02-25 06:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 04:00:00 CS 2026-02-25 05:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 03:00:00 CS 2026-02-25 04:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 02:00:00 CS 2026-02-25 03:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 01:00:00 CS 2026-02-25 02:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 00:00:00 CS 2026-02-25 01:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 23:00:00 CS 2026-02-25 00:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 21:00:00 CS 2026-02-24 22:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 20:00:00 CS 2026-02-24 21:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 19:00:00 CS 2026-02-24 20:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 18:00:00 CS 2026-02-24 19:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 17:00:00 CS 2026-02-24 18:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 16:00:00 CS 2026-02-24 17:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 15:00:00 CS 2026-02-24 16:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 14:00:00 CS 2026-02-24 15:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 13:00:00 CS 2026-02-24 14:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 12:00:00 CS 2026-02-24 13:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 11:00:00 CS 2026-02-24 12:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 10:00:00 CS 2026-02-24 11:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 09:00:00 CS 2026-02-24 10:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 08:00:00 CS 2026-02-24 09:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 07:00:00 CS 2026-02-24 08:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 06:00:00 CS 2026-02-24 07:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 05:00:00 CS 2026-02-24 06:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 04:00:00 CS 2026-02-24 05:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 03:00:00 CS 2026-02-24 04:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 02:00:00 CS 2026-02-24 03:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 01:00:00 CS 2026-02-24 02:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 00:00:00 CS 2026-02-24 01:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 23:00:00 CS 2026-02-24 00:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 21:00:00 CS 2026-02-23 22:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 20:00:00 CS 2026-02-23 21:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 19:00:00 CS 2026-02-23 20:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 18:00:00 CS 2026-02-23 19:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 17:00:00 CS 2026-02-23 18:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 16:00:00 CS 2026-02-23 17:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 15:00:00 CS 2026-02-23 16:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 14:00:00 CS 2026-02-23 15:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 13:00:00 CS 2026-02-23 14:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 12:00:00 CS 2026-02-23 13:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 11:00:00 CS 2026-02-23 12:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 10:00:00 CS 2026-02-23 11:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 09:00:00 CS 2026-02-23 10:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 08:00:00 CS 2026-02-23 09:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 07:00:00 CS 2026-02-23 08:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 06:00:00 CS 2026-02-23 07:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 05:00:00 CS 2026-02-23 06:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 04:00:00 CS 2026-02-23 05:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 03:00:00 CS 2026-02-23 04:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 02:00:00 CS 2026-02-23 03:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 01:00:00 CS 2026-02-23 02:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 00:00:00 CS 2026-02-23 01:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-22 23:00:00 CS 2026-02-23 00:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 21:00:00 CS 2026-02-24 22:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 20:00:00 CS 2026-02-24 21:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 19:00:00 CS 2026-02-24 20:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 18:00:00 CS 2026-02-24 19:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 17:00:00 CS 2026-02-24 18:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 16:00:00 CS 2026-02-24 17:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 15:00:00 CS 2026-02-24 16:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 14:00:00 CS 2026-02-24 15:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 13:00:00 CS 2026-02-24 14:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 12:00:00 CS 2026-02-24 13:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 11:00:00 CS 2026-02-24 12:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 10:00:00 CS 2026-02-24 11:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 09:00:00 CS 2026-02-24 10:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 08:00:00 CS 2026-02-24 09:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 07:00:00 CS 2026-02-24 08:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 06:00:00 CS 2026-02-24 07:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 05:00:00 CS 2026-02-24 06:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 04:00:00 CS 2026-02-24 05:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 03:00:00 CS 2026-02-24 04:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 02:00:00 CS 2026-02-24 03:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 01:00:00 CS 2026-02-24 02:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 00:00:00 CS 2026-02-24 01:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 23:00:00 CS 2026-02-24 00:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 21:00:00 CS 2026-02-23 22:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 20:00:00 CS 2026-02-23 21:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 19:00:00 CS 2026-02-23 20:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 18:00:00 CS 2026-02-23 19:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 17:00:00 CS 2026-02-23 18:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 16:00:00 CS 2026-02-23 17:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 15:00:00 CS 2026-02-23 16:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 14:00:00 CS 2026-02-23 15:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 13:00:00 CS 2026-02-23 14:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 12:00:00 CS 2026-02-23 13:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 11:00:00 CS 2026-02-23 12:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 10:00:00 CS 2026-02-23 11:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 09:00:00 CS 2026-02-23 10:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 08:00:00 CS 2026-02-23 09:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 07:00:00 CS 2026-02-23 08:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 06:00:00 CS 2026-02-23 07:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 05:00:00 CS 2026-02-23 06:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 04:00:00 CS 2026-02-23 05:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 03:00:00 CS 2026-02-23 04:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 02:00:00 CS 2026-02-23 03:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 01:00:00 CS 2026-02-23 02:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 00:00:00 CS 2026-02-23 01:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-22 23:00:00 CS 2026-02-23 00:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 21:00:00 CS 2026-02-25 22:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 20:00:00 CS 2026-02-25 21:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 19:00:00 CS 2026-02-25 20:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 18:00:00 CS 2026-02-25 19:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 17:00:00 CS 2026-02-25 18:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 16:00:00 CS 2026-02-25 17:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 15:00:00 CS 2026-02-25 16:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 14:00:00 CS 2026-02-25 15:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 13:00:00 CS 2026-02-25 14:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 12:00:00 CS 2026-02-25 13:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 11:00:00 CS 2026-02-25 12:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 10:00:00 CS 2026-02-25 11:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 09:00:00 CS 2026-02-25 10:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 08:00:00 CS 2026-02-25 09:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 07:00:00 CS 2026-02-25 08:00:00 CS 395 MW 2026-02-25 02:42:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 06:00:00 CS 2026-02-25 07:00:00 CS 381 MW 2026-02-25 05:27:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 05:00:00 CS 2026-02-25 06:00:00 CS 380 MW 2026-02-25 04:27:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 04:00:00 CS 2026-02-25 05:00:00 CS 395 MW 2026-02-25 02:42:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 03:00:00 CS 2026-02-25 04:00:00 CS 425 MW 2026-02-24 22:16:33 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 02:00:00 CS 2026-02-25 03:00:00 CS 425 MW 2026-02-24 22:16:33 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 01:00:00 CS 2026-02-25 02:00:00 CS 425 MW 2026-02-24 22:16:33 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 00:00:00 CS 2026-02-25 01:00:00 CS 425 MW 2026-02-24 22:16:33 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 23:00:00 CS 2026-02-25 00:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 21:00:00 CS 2026-02-25 22:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 20:00:00 CS 2026-02-25 21:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 19:00:00 CS 2026-02-25 20:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 18:00:00 CS 2026-02-25 19:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 17:00:00 CS 2026-02-25 18:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 16:00:00 CS 2026-02-25 17:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 15:00:00 CS 2026-02-25 16:00:00 CS 300 MW 2026-02-24 08:04:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 14:00:00 CS 2026-02-25 15:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 13:00:00 CS 2026-02-25 14:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 12:00:00 CS 2026-02-25 13:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 11:00:00 CS 2026-02-25 12:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 10:00:00 CS 2026-02-25 11:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 09:00:00 CS 2026-02-25 10:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 08:00:00 CS 2026-02-25 09:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 07:00:00 CS 2026-02-25 08:00:00 CS 30 MW 2026-02-25 02:40:56 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 06:00:00 CS 2026-02-25 07:00:00 CS 44 MW 2026-02-25 05:27:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 05:00:00 CS 2026-02-25 06:00:00 CS 45 MW 2026-02-25 04:27:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 04:00:00 CS 2026-02-25 05:00:00 CS 30 MW 2026-02-25 02:40:56 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 03:00:00 CS 2026-02-25 04:00:00 CS 0 MW 2026-02-24 22:15:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 02:00:00 CS 2026-02-25 03:00:00 CS 0 MW 2026-02-24 22:15:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 01:00:00 CS 2026-02-25 02:00:00 CS 0 MW 2026-02-24 22:15:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 00:00:00 CS 2026-02-25 01:00:00 CS 0 MW 2026-02-24 22:15:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 23:00:00 CS 2026-02-25 00:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 21:00:00 CS 2026-02-24 22:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 20:00:00 CS 2026-02-24 21:00:00 CS 40 MW 2026-02-24 17:54:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 19:00:00 CS 2026-02-24 20:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 18:00:00 CS 2026-02-24 19:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 17:00:00 CS 2026-02-24 18:00:00 CS 27 MW 2026-02-24 14:40:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 16:00:00 CS 2026-02-24 17:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 15:00:00 CS 2026-02-24 16:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 14:00:00 CS 2026-02-24 15:00:00 CS 0 MW 2026-02-24 11:26:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 13:00:00 CS 2026-02-24 14:00:00 CS 0 MW 2026-02-24 11:26:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 12:00:00 CS 2026-02-24 13:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 11:00:00 CS 2026-02-24 12:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 10:00:00 CS 2026-02-24 11:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 09:00:00 CS 2026-02-24 10:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 08:00:00 CS 2026-02-24 09:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 07:00:00 CS 2026-02-24 08:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 06:00:00 CS 2026-02-24 07:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 05:00:00 CS 2026-02-24 06:00:00 CS 118 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 04:00:00 CS 2026-02-24 05:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 03:00:00 CS 2026-02-24 04:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 02:00:00 CS 2026-02-24 03:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 01:00:00 CS 2026-02-24 02:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 00:00:00 CS 2026-02-24 01:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 23:00:00 CS 2026-02-24 00:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 21:00:00 CS 2026-02-24 22:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 20:00:00 CS 2026-02-24 21:00:00 CS 385 MW 2026-02-24 17:56:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 19:00:00 CS 2026-02-24 20:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 18:00:00 CS 2026-02-24 19:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 17:00:00 CS 2026-02-24 18:00:00 CS 397 MW 2026-02-24 14:37:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 16:00:00 CS 2026-02-24 17:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 15:00:00 CS 2026-02-24 16:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 14:00:00 CS 2026-02-24 15:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 13:00:00 CS 2026-02-24 14:00:00 CS 425 MW 2026-02-24 11:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 12:00:00 CS 2026-02-24 13:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 11:00:00 CS 2026-02-24 12:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 10:00:00 CS 2026-02-24 11:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 09:00:00 CS 2026-02-24 10:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 08:00:00 CS 2026-02-24 09:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 07:00:00 CS 2026-02-24 08:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 06:00:00 CS 2026-02-24 07:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 05:00:00 CS 2026-02-24 06:00:00 CS 305 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 04:00:00 CS 2026-02-24 05:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 03:00:00 CS 2026-02-24 04:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 02:00:00 CS 2026-02-24 03:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 01:00:00 CS 2026-02-24 02:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 00:00:00 CS 2026-02-24 01:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 23:00:00 CS 2026-02-24 00:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 21:00:00 CS 2026-02-23 22:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 20:00:00 CS 2026-02-23 21:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 19:00:00 CS 2026-02-23 20:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 18:00:00 CS 2026-02-23 19:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 17:00:00 CS 2026-02-23 18:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 16:00:00 CS 2026-02-23 17:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 15:00:00 CS 2026-02-23 16:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 14:00:00 CS 2026-02-23 15:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 13:00:00 CS 2026-02-23 14:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 12:00:00 CS 2026-02-23 13:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 11:00:00 CS 2026-02-23 12:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 10:00:00 CS 2026-02-23 11:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 09:00:00 CS 2026-02-23 10:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 08:00:00 CS 2026-02-23 09:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 07:00:00 CS 2026-02-23 08:00:00 CS 400 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 06:00:00 CS 2026-02-23 07:00:00 CS 332 MW 2026-02-23 04:14:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 05:00:00 CS 2026-02-23 06:00:00 CS 332 MW 2026-02-23 03:15:50 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 04:00:00 CS 2026-02-23 05:00:00 CS 282 MW 2026-02-23 02:23:57 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 03:00:00 CS 2026-02-23 04:00:00 CS 314 MW 2026-02-23 01:27:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 02:00:00 CS 2026-02-23 03:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 01:00:00 CS 2026-02-23 02:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 00:00:00 CS 2026-02-23 01:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 23:00:00 CS 2026-02-23 00:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 21:00:00 CS 2026-02-23 22:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 20:00:00 CS 2026-02-23 21:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 19:00:00 CS 2026-02-23 20:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 18:00:00 CS 2026-02-23 19:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 17:00:00 CS 2026-02-23 18:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 16:00:00 CS 2026-02-23 17:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 15:00:00 CS 2026-02-23 16:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 14:00:00 CS 2026-02-23 15:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 13:00:00 CS 2026-02-23 14:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 12:00:00 CS 2026-02-23 13:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 11:00:00 CS 2026-02-23 12:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 10:00:00 CS 2026-02-23 11:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 09:00:00 CS 2026-02-23 10:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 08:00:00 CS 2026-02-23 09:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 07:00:00 CS 2026-02-23 08:00:00 CS 250 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 06:00:00 CS 2026-02-23 07:00:00 CS 315 MW 2026-02-23 04:17:09 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 05:00:00 CS 2026-02-23 06:00:00 CS 315 MW 2026-02-23 03:18:25 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 04:00:00 CS 2026-02-23 05:00:00 CS 365 MW 2026-02-23 02:25:41 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 03:00:00 CS 2026-02-23 04:00:00 CS 334 MW 2026-02-23 01:32:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 02:00:00 CS 2026-02-23 03:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 01:00:00 CS 2026-02-23 02:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 00:00:00 CS 2026-02-23 01:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 23:00:00 CS 2026-02-23 00:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 21:00:00 CS 2026-02-22 22:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 20:00:00 CS 2026-02-22 21:00:00 CS 395 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 19:00:00 CS 2026-02-22 20:00:00 CS 380 MW 2026-02-22 16:34:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 18:00:00 CS 2026-02-22 19:00:00 CS 380 MW 2026-02-22 16:34:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 17:00:00 CS 2026-02-22 18:00:00 CS 425 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 16:00:00 CS 2026-02-22 17:00:00 CS 425 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 15:00:00 CS 2026-02-22 16:00:00 CS 425 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 14:00:00 CS 2026-02-22 15:00:00 CS 395 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 13:00:00 CS 2026-02-22 14:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 12:00:00 CS 2026-02-22 13:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 11:00:00 CS 2026-02-22 12:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 10:00:00 CS 2026-02-22 11:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 09:00:00 CS 2026-02-22 10:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 08:00:00 CS 2026-02-22 09:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 07:00:00 CS 2026-02-22 08:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 06:00:00 CS 2026-02-22 07:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 05:00:00 CS 2026-02-22 06:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 04:00:00 CS 2026-02-22 05:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 03:00:00 CS 2026-02-22 04:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 02:00:00 CS 2026-02-22 03:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 01:00:00 CS 2026-02-22 02:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 00:00:00 CS 2026-02-22 01:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 23:00:00 CS 2026-02-22 00:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 21:00:00 CS 2026-02-22 22:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 20:00:00 CS 2026-02-22 21:00:00 CS 255 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 19:00:00 CS 2026-02-22 20:00:00 CS 268 MW 2026-02-22 16:38:49 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 18:00:00 CS 2026-02-22 19:00:00 CS 268 MW 2026-02-22 16:38:49 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 17:00:00 CS 2026-02-22 18:00:00 CS 225 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 16:00:00 CS 2026-02-22 17:00:00 CS 225 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 15:00:00 CS 2026-02-22 16:00:00 CS 225 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 14:00:00 CS 2026-02-22 15:00:00 CS 255 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 13:00:00 CS 2026-02-22 14:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 12:00:00 CS 2026-02-22 13:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 11:00:00 CS 2026-02-22 12:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 10:00:00 CS 2026-02-22 11:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 09:00:00 CS 2026-02-22 10:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 08:00:00 CS 2026-02-22 09:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 07:00:00 CS 2026-02-22 08:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 06:00:00 CS 2026-02-22 07:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 05:00:00 CS 2026-02-22 06:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 04:00:00 CS 2026-02-22 05:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 03:00:00 CS 2026-02-22 04:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 02:00:00 CS 2026-02-22 03:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 01:00:00 CS 2026-02-22 02:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 00:00:00 CS 2026-02-22 01:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 23:00:00 CS 2026-02-22 00:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 21:00:00 CS 2026-02-21 22:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 20:00:00 CS 2026-02-21 21:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 19:00:00 CS 2026-02-21 20:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 18:00:00 CS 2026-02-21 19:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 17:00:00 CS 2026-02-21 18:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 16:00:00 CS 2026-02-21 17:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 15:00:00 CS 2026-02-21 16:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 14:00:00 CS 2026-02-21 15:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 13:00:00 CS 2026-02-21 14:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 12:00:00 CS 2026-02-21 13:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 11:00:00 CS 2026-02-21 12:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 10:00:00 CS 2026-02-21 11:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 09:00:00 CS 2026-02-21 10:00:00 CS 380 MW 2026-02-21 05:54:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 08:00:00 CS 2026-02-21 09:00:00 CS 380 MW 2026-02-21 05:54:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 07:00:00 CS 2026-02-21 08:00:00 CS 400 MW 2026-02-21 06:34:02 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 06:00:00 CS 2026-02-21 07:00:00 CS 400 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 05:00:00 CS 2026-02-21 06:00:00 CS 400 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 04:00:00 CS 2026-02-21 05:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 03:00:00 CS 2026-02-21 04:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 02:00:00 CS 2026-02-21 03:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 01:00:00 CS 2026-02-21 02:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 00:00:00 CS 2026-02-21 01:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 23:00:00 CS 2026-02-21 00:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 21:00:00 CS 2026-02-21 22:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 20:00:00 CS 2026-02-21 21:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 19:00:00 CS 2026-02-21 20:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 18:00:00 CS 2026-02-21 19:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 17:00:00 CS 2026-02-21 18:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 16:00:00 CS 2026-02-21 17:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 15:00:00 CS 2026-02-21 16:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 14:00:00 CS 2026-02-21 15:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 13:00:00 CS 2026-02-21 14:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 12:00:00 CS 2026-02-21 13:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 11:00:00 CS 2026-02-21 12:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 10:00:00 CS 2026-02-21 11:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 09:00:00 CS 2026-02-21 10:00:00 CS 270 MW 2026-02-21 05:53:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 08:00:00 CS 2026-02-21 09:00:00 CS 270 MW 2026-02-21 05:53:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 07:00:00 CS 2026-02-21 08:00:00 CS 250 MW 2026-02-21 06:34:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 06:00:00 CS 2026-02-21 07:00:00 CS 250 MW 2026-02-20 08:38:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 05:00:00 CS 2026-02-21 06:00:00 CS 250 MW 2026-02-20 08:38:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 04:00:00 CS 2026-02-21 05:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 03:00:00 CS 2026-02-21 04:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 02:00:00 CS 2026-02-21 03:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 01:00:00 CS 2026-02-21 02:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 00:00:00 CS 2026-02-21 01:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 23:00:00 CS 2026-02-21 00:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 21:00:00 CS 2026-02-20 22:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 20:00:00 CS 2026-02-20 21:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 19:00:00 CS 2026-02-20 20:00:00 CS 395 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 18:00:00 CS 2026-02-20 19:00:00 CS 455 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 17:00:00 CS 2026-02-20 18:00:00 CS 455 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 16:00:00 CS 2026-02-20 17:00:00 CS 455 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 15:00:00 CS 2026-02-20 16:00:00 CS 434 MW 2026-02-20 14:43:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 14:00:00 CS 2026-02-20 15:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 13:00:00 CS 2026-02-20 14:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 12:00:00 CS 2026-02-20 13:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 11:00:00 CS 2026-02-20 12:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 10:00:00 CS 2026-02-20 11:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 09:00:00 CS 2026-02-20 10:00:00 CS 435 MW 2026-02-20 07:37:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 08:00:00 CS 2026-02-20 09:00:00 CS 390 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 07:00:00 CS 2026-02-20 08:00:00 CS 425 MW 2026-02-20 01:07:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 06:00:00 CS 2026-02-20 07:00:00 CS 432 MW 2026-02-20 05:32:00 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 05:00:00 CS 2026-02-20 06:00:00 CS 441 MW 2026-02-20 04:33:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 04:00:00 CS 2026-02-20 05:00:00 CS 460 MW 2026-02-20 01:07:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 03:00:00 CS 2026-02-20 04:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 02:00:00 CS 2026-02-20 03:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 01:00:00 CS 2026-02-20 02:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 00:00:00 CS 2026-02-20 01:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 23:00:00 CS 2026-02-20 00:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 21:00:00 CS 2026-02-20 22:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 20:00:00 CS 2026-02-20 21:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 19:00:00 CS 2026-02-20 20:00:00 CS 255 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 18:00:00 CS 2026-02-20 19:00:00 CS 195 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 17:00:00 CS 2026-02-20 18:00:00 CS 195 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 16:00:00 CS 2026-02-20 17:00:00 CS 195 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 15:00:00 CS 2026-02-20 16:00:00 CS 216 MW 2026-02-20 14:43:12 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 14:00:00 CS 2026-02-20 15:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 13:00:00 CS 2026-02-20 14:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 12:00:00 CS 2026-02-20 13:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 11:00:00 CS 2026-02-20 12:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 10:00:00 CS 2026-02-20 11:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 09:00:00 CS 2026-02-20 10:00:00 CS 215 MW 2026-02-20 07:36:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 08:00:00 CS 2026-02-20 09:00:00 CS 260 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 07:00:00 CS 2026-02-20 08:00:00 CS 225 MW 2026-02-20 01:06:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 06:00:00 CS 2026-02-20 07:00:00 CS 218 MW 2026-02-20 05:32:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 05:00:00 CS 2026-02-20 06:00:00 CS 209 MW 2026-02-20 04:33:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 04:00:00 CS 2026-02-20 05:00:00 CS 190 MW 2026-02-20 01:06:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 03:00:00 CS 2026-02-20 04:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 02:00:00 CS 2026-02-20 03:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 01:00:00 CS 2026-02-20 02:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 00:00:00 CS 2026-02-20 01:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 23:00:00 CS 2026-02-20 00:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 21:00:00 CS 2026-02-19 22:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 20:00:00 CS 2026-02-19 21:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 19:00:00 CS 2026-02-19 20:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 18:00:00 CS 2026-02-19 19:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 17:00:00 CS 2026-02-19 18:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 16:00:00 CS 2026-02-19 17:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 15:00:00 CS 2026-02-19 16:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 14:00:00 CS 2026-02-19 15:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 13:00:00 CS 2026-02-19 14:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 12:00:00 CS 2026-02-19 13:00:00 CS 350 MW 2026-02-19 09:28:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 11:00:00 CS 2026-02-19 12:00:00 CS 350 MW 2026-02-19 09:28:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 10:00:00 CS 2026-02-19 11:00:00 CS 365 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 09:00:00 CS 2026-02-19 10:00:00 CS 365 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 08:00:00 CS 2026-02-19 09:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 07:00:00 CS 2026-02-19 08:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 06:00:00 CS 2026-02-19 07:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 05:00:00 CS 2026-02-19 06:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 04:00:00 CS 2026-02-19 05:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 03:00:00 CS 2026-02-19 04:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 02:00:00 CS 2026-02-19 03:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 01:00:00 CS 2026-02-19 02:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 00:00:00 CS 2026-02-19 01:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 23:00:00 CS 2026-02-19 00:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 21:00:00 CS 2026-02-19 22:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 20:00:00 CS 2026-02-19 21:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 19:00:00 CS 2026-02-19 20:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 18:00:00 CS 2026-02-19 19:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 17:00:00 CS 2026-02-19 18:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 16:00:00 CS 2026-02-19 17:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 15:00:00 CS 2026-02-19 16:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 14:00:00 CS 2026-02-19 15:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 13:00:00 CS 2026-02-19 14:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 12:00:00 CS 2026-02-19 13:00:00 CS 300 MW 2026-02-19 09:28:49 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 11:00:00 CS 2026-02-19 12:00:00 CS 300 MW 2026-02-19 09:28:49 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 10:00:00 CS 2026-02-19 11:00:00 CS 285 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 09:00:00 CS 2026-02-19 10:00:00 CS 285 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 08:00:00 CS 2026-02-19 09:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 07:00:00 CS 2026-02-19 08:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 06:00:00 CS 2026-02-19 07:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 05:00:00 CS 2026-02-19 06:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 04:00:00 CS 2026-02-19 05:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 03:00:00 CS 2026-02-19 04:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 02:00:00 CS 2026-02-19 03:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 01:00:00 CS 2026-02-19 02:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 00:00:00 CS 2026-02-19 01:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 23:00:00 CS 2026-02-19 00:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 21:00:00 CS 2026-02-18 22:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 20:00:00 CS 2026-02-18 21:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 19:00:00 CS 2026-02-18 20:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 18:00:00 CS 2026-02-18 19:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 17:00:00 CS 2026-02-18 18:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 16:00:00 CS 2026-02-18 17:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 15:00:00 CS 2026-02-18 16:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 14:00:00 CS 2026-02-18 15:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 13:00:00 CS 2026-02-18 14:00:00 CS 365 MW 2026-02-18 09:31:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 12:00:00 CS 2026-02-18 13:00:00 CS 380 MW 2026-02-18 10:24:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 11:00:00 CS 2026-02-18 12:00:00 CS 365 MW 2026-02-18 09:31:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 10:00:00 CS 2026-02-18 11:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 09:00:00 CS 2026-02-18 10:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 08:00:00 CS 2026-02-18 09:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 07:00:00 CS 2026-02-18 08:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 06:00:00 CS 2026-02-18 07:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 05:00:00 CS 2026-02-18 06:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 04:00:00 CS 2026-02-18 05:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 03:00:00 CS 2026-02-18 04:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 02:00:00 CS 2026-02-18 03:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 01:00:00 CS 2026-02-18 02:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 00:00:00 CS 2026-02-18 01:00:00 CS 350 MW 2026-02-17 10:30:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 23:00:00 CS 2026-02-18 00:00:00 CS 318 MW 2026-02-18 06:40:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 21:00:00 CS 2026-02-18 22:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 20:00:00 CS 2026-02-18 21:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 19:00:00 CS 2026-02-18 20:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 18:00:00 CS 2026-02-18 19:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 17:00:00 CS 2026-02-18 18:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 16:00:00 CS 2026-02-18 17:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 15:00:00 CS 2026-02-18 16:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 14:00:00 CS 2026-02-18 15:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 13:00:00 CS 2026-02-18 14:00:00 CS 285 MW 2026-02-18 10:22:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 12:00:00 CS 2026-02-18 13:00:00 CS 270 MW 2026-02-18 10:23:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 11:00:00 CS 2026-02-18 12:00:00 CS 285 MW 2026-02-18 09:30:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 10:00:00 CS 2026-02-18 11:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 09:00:00 CS 2026-02-18 10:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 08:00:00 CS 2026-02-18 09:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 07:00:00 CS 2026-02-18 08:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 06:00:00 CS 2026-02-18 07:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 05:00:00 CS 2026-02-18 06:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 04:00:00 CS 2026-02-18 05:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 03:00:00 CS 2026-02-18 04:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 02:00:00 CS 2026-02-18 03:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 01:00:00 CS 2026-02-18 02:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 00:00:00 CS 2026-02-18 01:00:00 CS 300 MW 2026-02-17 10:29:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 23:00:00 CS 2026-02-18 00:00:00 CS 331 MW 2026-02-17 20:49:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 21:00:00 CS 2026-02-17 22:00:00 CS 358 MW 2026-02-17 19:11:14 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 20:00:00 CS 2026-02-17 21:00:00 CS 277 MW 2026-02-17 18:24:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 19:00:00 CS 2026-02-17 20:00:00 CS 256 MW 2026-02-17 17:12:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 18:00:00 CS 2026-02-17 19:00:00 CS 292 MW 2026-02-17 16:50:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 17:00:00 CS 2026-02-17 18:00:00 CS 286 MW 2026-02-17 15:14:11 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 16:00:00 CS 2026-02-17 17:00:00 CS 286 MW 2026-02-17 13:34:37 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 15:00:00 CS 2026-02-17 16:00:00 CS 286 MW 2026-02-17 13:34:37 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 14:00:00 CS 2026-02-17 15:00:00 CS 359 MW 2026-02-17 12:40:54 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 13:00:00 CS 2026-02-17 14:00:00 CS 375 MW 2026-02-17 11:12:30 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 12:00:00 CS 2026-02-17 13:00:00 CS 361 MW 2026-02-17 10:22:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 11:00:00 CS 2026-02-17 12:00:00 CS 425 MW 2026-02-16 08:58:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 10:00:00 CS 2026-02-17 11:00:00 CS 425 MW 2026-02-16 08:58:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 09:00:00 CS 2026-02-17 10:00:00 CS 408 MW 2026-02-17 07:49:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 08:00:00 CS 2026-02-17 09:00:00 CS 408 MW 2026-02-17 06:37:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 07:00:00 CS 2026-02-17 08:00:00 CS 408 MW 2026-02-17 05:44:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 06:00:00 CS 2026-02-17 07:00:00 CS 435 MW 2026-02-17 05:33:40 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 05:00:00 CS 2026-02-17 06:00:00 CS 450 MW 2026-02-16 08:58:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 04:00:00 CS 2026-02-17 05:00:00 CS 450 MW 2026-02-16 08:58:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 03:00:00 CS 2026-02-17 04:00:00 CS 395 MW 2026-02-16 21:57:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 02:00:00 CS 2026-02-17 03:00:00 CS 395 MW 2026-02-16 21:57:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 01:00:00 CS 2026-02-17 02:00:00 CS 395 MW 2026-02-16 21:57:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 00:00:00 CS 2026-02-17 01:00:00 CS 395 MW 2026-02-16 21:57:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 23:00:00 CS 2026-02-17 00:00:00 CS 395 MW 2026-02-16 21:57:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 21:00:00 CS 2026-02-17 22:00:00 CS 287 MW 2026-02-17 19:12:09 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 20:00:00 CS 2026-02-17 21:00:00 CS 364 MW 2026-02-17 18:26:25 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 19:00:00 CS 2026-02-17 20:00:00 CS 385 MW 2026-02-17 17:23:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 18:00:00 CS 2026-02-17 19:00:00 CS 351 MW 2026-02-17 16:52:24 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 17:00:00 CS 2026-02-17 18:00:00 CS 357 MW 2026-02-17 15:16:36 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 16:00:00 CS 2026-02-17 17:00:00 CS 357 MW 2026-02-17 13:37:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 15:00:00 CS 2026-02-17 16:00:00 CS 357 MW 2026-02-17 13:37:47 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 14:00:00 CS 2026-02-17 15:00:00 CS 287 MW 2026-02-17 12:44:29 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 13:00:00 CS 2026-02-17 14:00:00 CS 273 MW 2026-02-17 11:19:03 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 12:00:00 CS 2026-02-17 13:00:00 CS 286 MW 2026-02-17 10:27:12 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 11:00:00 CS 2026-02-17 12:00:00 CS 225 MW 2026-02-16 08:56:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 10:00:00 CS 2026-02-17 11:00:00 CS 225 MW 2026-02-16 08:56:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 09:00:00 CS 2026-02-17 10:00:00 CS 240 MW 2026-02-17 07:51:10 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 08:00:00 CS 2026-02-17 09:00:00 CS 240 MW 2026-02-17 06:42:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 07:00:00 CS 2026-02-17 08:00:00 CS 240 MW 2026-02-17 05:48:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 06:00:00 CS 2026-02-17 07:00:00 CS 215 MW 2026-02-17 05:33:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 05:00:00 CS 2026-02-17 06:00:00 CS 200 MW 2026-02-16 08:56:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 04:00:00 CS 2026-02-17 05:00:00 CS 200 MW 2026-02-16 08:56:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 03:00:00 CS 2026-02-17 04:00:00 CS 255 MW 2026-02-16 21:55:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 02:00:00 CS 2026-02-17 03:00:00 CS 255 MW 2026-02-16 21:55:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 01:00:00 CS 2026-02-17 02:00:00 CS 255 MW 2026-02-16 21:55:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 00:00:00 CS 2026-02-17 01:00:00 CS 255 MW 2026-02-16 21:55:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 23:00:00 CS 2026-02-17 00:00:00 CS 255 MW 2026-02-16 21:55:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 21:00:00 CS 2026-02-16 22:00:00 CS 350 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 20:00:00 CS 2026-02-16 21:00:00 CS 395 MW 2026-02-16 12:43:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 19:00:00 CS 2026-02-16 20:00:00 CS 425 MW 2026-02-16 18:00:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 18:00:00 CS 2026-02-16 19:00:00 CS 385 MW 2026-02-16 17:00:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 17:00:00 CS 2026-02-16 18:00:00 CS 447 MW 2026-02-16 16:00:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 16:00:00 CS 2026-02-16 17:00:00 CS 447 MW 2026-02-16 15:00:54 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 15:00:00 CS 2026-02-16 16:00:00 CS 453 MW 2026-02-16 14:34:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 14:00:00 CS 2026-02-16 15:00:00 CS 432 MW 2026-02-16 13:27:57 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 13:00:00 CS 2026-02-16 14:00:00 CS 455 MW 2026-02-16 09:48:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 12:00:00 CS 2026-02-16 13:00:00 CS 455 MW 2026-02-16 09:48:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 11:00:00 CS 2026-02-16 12:00:00 CS 455 MW 2026-02-16 09:48:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 10:00:00 CS 2026-02-16 11:00:00 CS 460 MW 2026-02-16 08:40:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 09:00:00 CS 2026-02-16 10:00:00 CS 460 MW 2026-02-16 06:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 08:00:00 CS 2026-02-16 09:00:00 CS 460 MW 2026-02-16 06:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 07:00:00 CS 2026-02-16 08:00:00 CS 462 MW 2026-02-16 06:33:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 06:00:00 CS 2026-02-16 07:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 05:00:00 CS 2026-02-16 06:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 04:00:00 CS 2026-02-16 05:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 03:00:00 CS 2026-02-16 04:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 02:00:00 CS 2026-02-16 03:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 01:00:00 CS 2026-02-16 02:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 00:00:00 CS 2026-02-16 01:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 23:00:00 CS 2026-02-16 00:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 21:00:00 CS 2026-02-16 22:00:00 CS 300 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 20:00:00 CS 2026-02-16 21:00:00 CS 255 MW 2026-02-16 12:42:34 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 19:00:00 CS 2026-02-16 20:00:00 CS 225 MW 2026-02-16 18:00:41 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 18:00:00 CS 2026-02-16 19:00:00 CS 262 MW 2026-02-16 17:00:53 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 17:00:00 CS 2026-02-16 18:00:00 CS 202 MW 2026-02-16 16:00:42 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 16:00:00 CS 2026-02-16 17:00:00 CS 202 MW 2026-02-16 15:00:54 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 15:00:00 CS 2026-02-16 16:00:00 CS 197 MW 2026-02-16 14:34:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 14:00:00 CS 2026-02-16 15:00:00 CS 218 MW 2026-02-16 13:27:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 13:00:00 CS 2026-02-16 14:00:00 CS 195 MW 2026-02-16 09:47:01 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 12:00:00 CS 2026-02-16 13:00:00 CS 195 MW 2026-02-16 09:47:01 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 11:00:00 CS 2026-02-16 12:00:00 CS 195 MW 2026-02-16 09:47:01 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 10:00:00 CS 2026-02-16 11:00:00 CS 190 MW 2026-02-16 08:39:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 09:00:00 CS 2026-02-16 10:00:00 CS 190 MW 2026-02-16 06:48:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 08:00:00 CS 2026-02-16 09:00:00 CS 190 MW 2026-02-16 06:48:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 07:00:00 CS 2026-02-16 08:00:00 CS 188 MW 2026-02-16 06:33:31 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 06:00:00 CS 2026-02-16 07:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 05:00:00 CS 2026-02-16 06:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 04:00:00 CS 2026-02-16 05:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 03:00:00 CS 2026-02-16 04:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 02:00:00 CS 2026-02-16 03:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 01:00:00 CS 2026-02-16 02:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 00:00:00 CS 2026-02-16 01:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 23:00:00 CS 2026-02-16 00:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 21:00:00 CS 2026-02-15 22:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 20:00:00 CS 2026-02-15 21:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 19:00:00 CS 2026-02-15 20:00:00 CS 395 MW 2026-02-15 16:27:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 18:00:00 CS 2026-02-15 19:00:00 CS 395 MW 2026-02-15 16:27:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 17:00:00 CS 2026-02-15 18:00:00 CS 395 MW 2026-02-15 13:51:05 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 16:00:00 CS 2026-02-15 17:00:00 CS 395 MW 2026-02-15 13:51:05 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 15:00:00 CS 2026-02-15 16:00:00 CS 395 MW 2026-02-15 13:51:05 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 14:00:00 CS 2026-02-15 15:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 13:00:00 CS 2026-02-15 14:00:00 CS 380 MW 2026-02-15 10:47:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 12:00:00 CS 2026-02-15 13:00:00 CS 380 MW 2026-02-15 10:47:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 11:00:00 CS 2026-02-15 12:00:00 CS 395 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 10:00:00 CS 2026-02-15 11:00:00 CS 381 MW 2026-02-15 09:32:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 09:00:00 CS 2026-02-15 10:00:00 CS 382 MW 2026-02-15 08:32:09 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 08:00:00 CS 2026-02-15 09:00:00 CS 395 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 07:00:00 CS 2026-02-15 08:00:00 CS 395 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 06:00:00 CS 2026-02-15 07:00:00 CS 395 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 05:00:00 CS 2026-02-15 06:00:00 CS 395 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 04:00:00 CS 2026-02-15 05:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 03:00:00 CS 2026-02-15 04:00:00 CS 350 MW 2026-02-15 02:00:44 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 02:00:00 CS 2026-02-15 03:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 01:00:00 CS 2026-02-15 02:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 00:00:00 CS 2026-02-15 01:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 23:00:00 CS 2026-02-15 00:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 21:00:00 CS 2026-02-15 22:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 20:00:00 CS 2026-02-15 21:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 19:00:00 CS 2026-02-15 20:00:00 CS 255 MW 2026-02-15 16:26:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 18:00:00 CS 2026-02-15 19:00:00 CS 255 MW 2026-02-15 16:26:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 17:00:00 CS 2026-02-15 18:00:00 CS 255 MW 2026-02-15 13:49:11 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 16:00:00 CS 2026-02-15 17:00:00 CS 255 MW 2026-02-15 13:49:11 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 15:00:00 CS 2026-02-15 16:00:00 CS 255 MW 2026-02-15 13:49:11 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 14:00:00 CS 2026-02-15 15:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 13:00:00 CS 2026-02-15 14:00:00 CS 270 MW 2026-02-15 10:45:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 12:00:00 CS 2026-02-15 13:00:00 CS 270 MW 2026-02-15 10:45:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 11:00:00 CS 2026-02-15 12:00:00 CS 255 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 10:00:00 CS 2026-02-15 11:00:00 CS 269 MW 2026-02-15 09:32:59 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 09:00:00 CS 2026-02-15 10:00:00 CS 268 MW 2026-02-15 08:32:09 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 08:00:00 CS 2026-02-15 09:00:00 CS 255 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 07:00:00 CS 2026-02-15 08:00:00 CS 255 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 06:00:00 CS 2026-02-15 07:00:00 CS 255 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 05:00:00 CS 2026-02-15 06:00:00 CS 255 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 04:00:00 CS 2026-02-15 05:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 03:00:00 CS 2026-02-15 04:00:00 CS 300 MW 2026-02-15 00:38:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 02:00:00 CS 2026-02-15 03:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 01:00:00 CS 2026-02-15 02:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 00:00:00 CS 2026-02-15 01:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 23:00:00 CS 2026-02-15 00:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 21:00:00 CS 2026-02-14 22:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 20:00:00 CS 2026-02-14 21:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 19:00:00 CS 2026-02-14 20:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 18:00:00 CS 2026-02-14 19:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 17:00:00 CS 2026-02-14 18:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 16:00:00 CS 2026-02-14 17:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 15:00:00 CS 2026-02-14 16:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 14:00:00 CS 2026-02-14 15:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 13:00:00 CS 2026-02-14 14:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 12:00:00 CS 2026-02-14 13:00:00 CS 350 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 11:00:00 CS 2026-02-14 12:00:00 CS 350 MW 2026-02-14 10:00:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 10:00:00 CS 2026-02-14 11:00:00 CS 385 MW 2026-02-14 09:00:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 09:00:00 CS 2026-02-14 10:00:00 CS 425 MW 2026-02-14 07:49:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 08:00:00 CS 2026-02-14 09:00:00 CS 425 MW 2026-02-14 06:47:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 07:00:00 CS 2026-02-14 08:00:00 CS 425 MW 2026-02-14 06:00:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 06:00:00 CS 2026-02-14 07:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 05:00:00 CS 2026-02-14 06:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 04:00:00 CS 2026-02-14 05:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 03:00:00 CS 2026-02-14 04:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 02:00:00 CS 2026-02-14 03:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 01:00:00 CS 2026-02-14 02:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 00:00:00 CS 2026-02-14 01:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 23:00:00 CS 2026-02-14 00:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 21:00:00 CS 2026-02-14 22:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 20:00:00 CS 2026-02-14 21:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 19:00:00 CS 2026-02-14 20:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 18:00:00 CS 2026-02-14 19:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 17:00:00 CS 2026-02-14 18:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 16:00:00 CS 2026-02-14 17:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 15:00:00 CS 2026-02-14 16:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 14:00:00 CS 2026-02-14 15:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 13:00:00 CS 2026-02-14 14:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 12:00:00 CS 2026-02-14 13:00:00 CS 300 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 11:00:00 CS 2026-02-14 12:00:00 CS 300 MW 2026-02-14 10:00:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 10:00:00 CS 2026-02-14 11:00:00 CS 265 MW 2026-02-14 09:00:46 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 09:00:00 CS 2026-02-14 10:00:00 CS 225 MW 2026-02-14 07:48:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 08:00:00 CS 2026-02-14 09:00:00 CS 225 MW 2026-02-14 06:46:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 07:00:00 CS 2026-02-14 08:00:00 CS 225 MW 2026-02-14 06:00:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 06:00:00 CS 2026-02-14 07:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 05:00:00 CS 2026-02-14 06:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 04:00:00 CS 2026-02-14 05:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 03:00:00 CS 2026-02-14 04:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 02:00:00 CS 2026-02-14 03:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 01:00:00 CS 2026-02-14 02:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 00:00:00 CS 2026-02-14 01:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 23:00:00 CS 2026-02-14 00:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 21:00:00 CS 2026-02-13 22:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 20:00:00 CS 2026-02-13 21:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 19:00:00 CS 2026-02-13 20:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 18:00:00 CS 2026-02-13 19:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 17:00:00 CS 2026-02-13 18:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 16:00:00 CS 2026-02-13 17:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 15:00:00 CS 2026-02-13 16:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 14:00:00 CS 2026-02-13 15:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 13:00:00 CS 2026-02-13 14:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 12:00:00 CS 2026-02-13 13:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 11:00:00 CS 2026-02-13 12:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 10:00:00 CS 2026-02-13 11:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 09:00:00 CS 2026-02-13 10:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 08:00:00 CS 2026-02-13 09:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 07:00:00 CS 2026-02-13 08:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 06:00:00 CS 2026-02-13 07:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 05:00:00 CS 2026-02-13 06:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 04:00:00 CS 2026-02-13 05:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 03:00:00 CS 2026-02-13 04:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 02:00:00 CS 2026-02-13 03:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 01:00:00 CS 2026-02-13 02:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 00:00:00 CS 2026-02-13 01:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 23:00:00 CS 2026-02-13 00:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 21:00:00 CS 2026-02-12 22:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 20:00:00 CS 2026-02-12 21:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 19:00:00 CS 2026-02-12 20:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 18:00:00 CS 2026-02-12 19:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 17:00:00 CS 2026-02-12 18:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 16:00:00 CS 2026-02-12 17:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 15:00:00 CS 2026-02-12 16:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 14:00:00 CS 2026-02-12 15:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 13:00:00 CS 2026-02-12 14:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 12:00:00 CS 2026-02-12 13:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 11:00:00 CS 2026-02-12 12:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 10:00:00 CS 2026-02-12 11:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 09:00:00 CS 2026-02-12 10:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 08:00:00 CS 2026-02-12 09:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 07:00:00 CS 2026-02-12 08:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 06:00:00 CS 2026-02-12 07:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 05:00:00 CS 2026-02-12 06:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 04:00:00 CS 2026-02-12 05:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 03:00:00 CS 2026-02-12 04:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 02:00:00 CS 2026-02-12 03:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 01:00:00 CS 2026-02-12 02:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 00:00:00 CS 2026-02-12 01:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-11 23:00:00 CS 2026-02-12 00:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 21:00:00 CS 2026-02-13 22:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 20:00:00 CS 2026-02-13 21:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 19:00:00 CS 2026-02-13 20:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 18:00:00 CS 2026-02-13 19:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 17:00:00 CS 2026-02-13 18:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 16:00:00 CS 2026-02-13 17:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 15:00:00 CS 2026-02-13 16:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 14:00:00 CS 2026-02-13 15:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 13:00:00 CS 2026-02-13 14:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 12:00:00 CS 2026-02-13 13:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 11:00:00 CS 2026-02-13 12:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 10:00:00 CS 2026-02-13 11:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 09:00:00 CS 2026-02-13 10:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 08:00:00 CS 2026-02-13 09:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 07:00:00 CS 2026-02-13 08:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 06:00:00 CS 2026-02-13 07:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 05:00:00 CS 2026-02-13 06:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 04:00:00 CS 2026-02-13 05:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 03:00:00 CS 2026-02-13 04:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 02:00:00 CS 2026-02-13 03:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 01:00:00 CS 2026-02-13 02:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 00:00:00 CS 2026-02-13 01:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 23:00:00 CS 2026-02-13 00:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 21:00:00 CS 2026-02-12 22:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 20:00:00 CS 2026-02-12 21:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 19:00:00 CS 2026-02-12 20:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 18:00:00 CS 2026-02-12 19:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 17:00:00 CS 2026-02-12 18:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 16:00:00 CS 2026-02-12 17:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 15:00:00 CS 2026-02-12 16:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 14:00:00 CS 2026-02-12 15:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 13:00:00 CS 2026-02-12 14:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 12:00:00 CS 2026-02-12 13:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 11:00:00 CS 2026-02-12 12:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 10:00:00 CS 2026-02-12 11:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 09:00:00 CS 2026-02-12 10:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 08:00:00 CS 2026-02-12 09:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 07:00:00 CS 2026-02-12 08:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 06:00:00 CS 2026-02-12 07:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 05:00:00 CS 2026-02-12 06:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 04:00:00 CS 2026-02-12 05:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 03:00:00 CS 2026-02-12 04:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 02:00:00 CS 2026-02-12 03:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 01:00:00 CS 2026-02-12 02:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 00:00:00 CS 2026-02-12 01:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-11 23:00:00 CS 2026-02-12 00:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 21:00:00 CS 2026-02-13 22:00:00 CS 425 MW 2026-02-13 17:09:25 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 20:00:00 CS 2026-02-13 21:00:00 CS 425 MW 2026-02-13 17:09:25 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 19:00:00 CS 2026-02-13 20:00:00 CS 425 MW 2026-02-13 14:48:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 18:00:00 CS 2026-02-13 19:00:00 CS 425 MW 2026-02-13 14:48:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 17:00:00 CS 2026-02-13 18:00:00 CS 425 MW 2026-02-13 14:48:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 16:00:00 CS 2026-02-13 17:00:00 CS 425 MW 2026-02-13 14:48:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 15:00:00 CS 2026-02-13 16:00:00 CS 390 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 14:00:00 CS 2026-02-13 15:00:00 CS 425 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 13:00:00 CS 2026-02-13 14:00:00 CS 425 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 12:00:00 CS 2026-02-13 13:00:00 CS 425 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 11:00:00 CS 2026-02-13 12:00:00 CS 425 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 10:00:00 CS 2026-02-13 11:00:00 CS 425 MW 2026-02-13 08:45:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 09:00:00 CS 2026-02-13 10:00:00 CS 425 MW 2026-02-13 07:54:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 08:00:00 CS 2026-02-13 09:00:00 CS 425 MW 2026-02-13 06:28:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 07:00:00 CS 2026-02-13 08:00:00 CS 425 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 06:00:00 CS 2026-02-13 07:00:00 CS 425 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 05:00:00 CS 2026-02-13 06:00:00 CS 425 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 04:00:00 CS 2026-02-13 05:00:00 CS 400 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 03:00:00 CS 2026-02-13 04:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 02:00:00 CS 2026-02-13 03:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 01:00:00 CS 2026-02-13 02:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 00:00:00 CS 2026-02-13 01:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 23:00:00 CS 2026-02-13 00:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 21:00:00 CS 2026-02-13 22:00:00 CS 225 MW 2026-02-13 17:06:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 20:00:00 CS 2026-02-13 21:00:00 CS 225 MW 2026-02-13 17:06:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 19:00:00 CS 2026-02-13 20:00:00 CS 225 MW 2026-02-13 14:47:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 18:00:00 CS 2026-02-13 19:00:00 CS 225 MW 2026-02-13 14:47:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 17:00:00 CS 2026-02-13 18:00:00 CS 225 MW 2026-02-13 14:47:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 16:00:00 CS 2026-02-13 17:00:00 CS 225 MW 2026-02-13 14:47:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 15:00:00 CS 2026-02-13 16:00:00 CS 260 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 14:00:00 CS 2026-02-13 15:00:00 CS 0 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 13:00:00 CS 2026-02-13 14:00:00 CS 0 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 12:00:00 CS 2026-02-13 13:00:00 CS 0 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 11:00:00 CS 2026-02-13 12:00:00 CS 0 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 10:00:00 CS 2026-02-13 11:00:00 CS 0 MW 2026-02-13 08:43:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 09:00:00 CS 2026-02-13 10:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 08:00:00 CS 2026-02-13 09:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 07:00:00 CS 2026-02-13 08:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 06:00:00 CS 2026-02-13 07:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 05:00:00 CS 2026-02-13 06:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 04:00:00 CS 2026-02-13 05:00:00 CS 25 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 03:00:00 CS 2026-02-13 04:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 02:00:00 CS 2026-02-13 03:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 01:00:00 CS 2026-02-13 02:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 00:00:00 CS 2026-02-13 01:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 23:00:00 CS 2026-02-13 00:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 21:00:00 CS 2026-02-12 22:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 20:00:00 CS 2026-02-12 21:00:00 CS 275 MW 2026-02-12 14:16:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 19:00:00 CS 2026-02-12 20:00:00 CS 341 MW 2026-02-12 14:16:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 18:00:00 CS 2026-02-12 19:00:00 CS 341 MW 2026-02-12 14:16:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 17:00:00 CS 2026-02-12 18:00:00 CS 300 MW 2026-02-12 14:16:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 16:00:00 CS 2026-02-12 17:00:00 CS 300 MW 2026-02-12 14:16:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 15:00:00 CS 2026-02-12 16:00:00 CS 341 MW 2026-02-12 12:18:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 14:00:00 CS 2026-02-12 15:00:00 CS 341 MW 2026-02-12 12:18:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 13:00:00 CS 2026-02-12 14:00:00 CS 310 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 12:00:00 CS 2026-02-12 13:00:00 CS 310 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 11:00:00 CS 2026-02-12 12:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 10:00:00 CS 2026-02-12 11:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 09:00:00 CS 2026-02-12 10:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 08:00:00 CS 2026-02-12 09:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 07:00:00 CS 2026-02-12 08:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 06:00:00 CS 2026-02-12 07:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 05:00:00 CS 2026-02-12 06:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 04:00:00 CS 2026-02-12 05:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 03:00:00 CS 2026-02-12 04:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 02:00:00 CS 2026-02-12 03:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 01:00:00 CS 2026-02-12 02:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 00:00:00 CS 2026-02-12 01:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 23:00:00 CS 2026-02-12 00:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 21:00:00 CS 2026-02-12 22:00:00 CS 160 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 20:00:00 CS 2026-02-12 21:00:00 CS 145 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 19:00:00 CS 2026-02-12 20:00:00 CS 79 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 18:00:00 CS 2026-02-12 19:00:00 CS 79 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 17:00:00 CS 2026-02-12 18:00:00 CS 120 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 16:00:00 CS 2026-02-12 17:00:00 CS 120 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 15:00:00 CS 2026-02-12 16:00:00 CS 79 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 14:00:00 CS 2026-02-12 15:00:00 CS 79 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 13:00:00 CS 2026-02-12 14:00:00 CS 110 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 12:00:00 CS 2026-02-12 13:00:00 CS 110 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 11:00:00 CS 2026-02-12 12:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 10:00:00 CS 2026-02-12 11:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 09:00:00 CS 2026-02-12 10:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 08:00:00 CS 2026-02-12 09:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 07:00:00 CS 2026-02-12 08:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 06:00:00 CS 2026-02-12 07:00:00 CS 185 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 05:00:00 CS 2026-02-12 06:00:00 CS 410 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 04:00:00 CS 2026-02-12 05:00:00 CS 400 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 03:00:00 CS 2026-02-12 04:00:00 CS 400 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 02:00:00 CS 2026-02-12 03:00:00 CS 385 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 01:00:00 CS 2026-02-12 02:00:00 CS 385 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 00:00:00 CS 2026-02-12 01:00:00 CS 385 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 23:00:00 CS 2026-02-12 00:00:00 CS 385 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 21:00:00 CS 2026-02-11 22:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 20:00:00 CS 2026-02-11 21:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 19:00:00 CS 2026-02-11 20:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 18:00:00 CS 2026-02-11 19:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 17:00:00 CS 2026-02-11 18:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 16:00:00 CS 2026-02-11 17:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 15:00:00 CS 2026-02-11 16:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 14:00:00 CS 2026-02-11 15:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 13:00:00 CS 2026-02-11 14:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 12:00:00 CS 2026-02-11 13:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 11:00:00 CS 2026-02-11 12:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 10:00:00 CS 2026-02-11 11:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 09:00:00 CS 2026-02-11 10:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 08:00:00 CS 2026-02-11 09:00:00 CS 317 MW 2026-02-11 06:43:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 07:00:00 CS 2026-02-11 08:00:00 CS 292 MW 2026-02-11 05:40:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 06:00:00 CS 2026-02-11 07:00:00 CS 292 MW 2026-02-11 04:41:03 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 05:00:00 CS 2026-02-11 06:00:00 CS 332 MW 2026-02-11 03:51:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 04:00:00 CS 2026-02-11 05:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 03:00:00 CS 2026-02-11 04:00:00 CS 322 MW 2026-02-10 22:30:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 02:00:00 CS 2026-02-11 03:00:00 CS 322 MW 2026-02-10 22:26:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 01:00:00 CS 2026-02-11 02:00:00 CS 341 MW 2026-02-10 22:26:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 00:00:00 CS 2026-02-11 01:00:00 CS 322 MW 2026-02-10 23:00:39 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 23:00:00 CS 2026-02-11 00:00:00 CS 367 MW 2026-02-10 22:00:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 21:00:00 CS 2026-02-11 22:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 20:00:00 CS 2026-02-11 21:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 19:00:00 CS 2026-02-11 20:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 18:00:00 CS 2026-02-11 19:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 17:00:00 CS 2026-02-11 18:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 16:00:00 CS 2026-02-11 17:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 15:00:00 CS 2026-02-11 16:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 14:00:00 CS 2026-02-11 15:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 13:00:00 CS 2026-02-11 14:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 12:00:00 CS 2026-02-11 13:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 11:00:00 CS 2026-02-11 12:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 10:00:00 CS 2026-02-11 11:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 09:00:00 CS 2026-02-11 10:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 08:00:00 CS 2026-02-11 09:00:00 CS 330 MW 2026-02-11 06:44:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 07:00:00 CS 2026-02-11 08:00:00 CS 355 MW 2026-02-11 05:41:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 06:00:00 CS 2026-02-11 07:00:00 CS 355 MW 2026-02-11 04:42:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 05:00:00 CS 2026-02-11 06:00:00 CS 315 MW 2026-02-11 03:53:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 04:00:00 CS 2026-02-11 05:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 03:00:00 CS 2026-02-11 04:00:00 CS 325 MW 2026-02-10 22:32:11 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 02:00:00 CS 2026-02-11 03:00:00 CS 325 MW 2026-02-10 22:27:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 01:00:00 CS 2026-02-11 02:00:00 CS 305 MW 2026-02-10 22:27:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 00:00:00 CS 2026-02-11 01:00:00 CS 305 MW 2026-02-10 22:27:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 23:00:00 CS 2026-02-11 00:00:00 CS 260 MW 2026-02-10 21:28:56 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 21:00:00 CS 2026-02-10 22:00:00 CS 386 MW 2026-02-10 19:37:44 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 20:00:00 CS 2026-02-10 21:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 19:00:00 CS 2026-02-10 20:00:00 CS 300 MW 2026-02-10 15:37:41 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 18:00:00 CS 2026-02-10 19:00:00 CS 300 MW 2026-02-10 15:37:41 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 17:00:00 CS 2026-02-10 18:00:00 CS 300 MW 2026-02-10 15:37:41 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 16:00:00 CS 2026-02-10 17:00:00 CS 290 MW 2026-02-10 15:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 15:00:00 CS 2026-02-10 16:00:00 CS 291 MW 2026-02-10 14:38:48 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 14:00:00 CS 2026-02-10 15:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 13:00:00 CS 2026-02-10 14:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 12:00:00 CS 2026-02-10 13:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 11:00:00 CS 2026-02-10 12:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 10:00:00 CS 2026-02-10 11:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 09:00:00 CS 2026-02-10 10:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 08:00:00 CS 2026-02-10 09:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 07:00:00 CS 2026-02-10 08:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 06:00:00 CS 2026-02-10 07:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 05:00:00 CS 2026-02-10 06:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 04:00:00 CS 2026-02-10 05:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 03:00:00 CS 2026-02-10 04:00:00 CS 300 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 02:00:00 CS 2026-02-10 03:00:00 CS 334 MW 2026-02-09 19:16:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 01:00:00 CS 2026-02-10 02:00:00 CS 334 MW 2026-02-09 19:16:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 00:00:00 CS 2026-02-10 01:00:00 CS 334 MW 2026-02-09 19:16:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 23:00:00 CS 2026-02-10 00:00:00 CS 334 MW 2026-02-09 19:16:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 21:00:00 CS 2026-02-10 22:00:00 CS 260 MW 2026-02-10 19:32:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 20:00:00 CS 2026-02-10 21:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 19:00:00 CS 2026-02-10 20:00:00 CS 350 MW 2026-02-10 15:37:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 18:00:00 CS 2026-02-10 19:00:00 CS 350 MW 2026-02-10 15:37:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 17:00:00 CS 2026-02-10 18:00:00 CS 350 MW 2026-02-10 15:37:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 16:00:00 CS 2026-02-10 17:00:00 CS 360 MW 2026-02-10 15:31:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 15:00:00 CS 2026-02-10 16:00:00 CS 359 MW 2026-02-10 14:38:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 14:00:00 CS 2026-02-10 15:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 13:00:00 CS 2026-02-10 14:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 12:00:00 CS 2026-02-10 13:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 11:00:00 CS 2026-02-10 12:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 10:00:00 CS 2026-02-10 11:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 09:00:00 CS 2026-02-10 10:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 08:00:00 CS 2026-02-10 09:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 07:00:00 CS 2026-02-10 08:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 06:00:00 CS 2026-02-10 07:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 05:00:00 CS 2026-02-10 06:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 04:00:00 CS 2026-02-10 05:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 03:00:00 CS 2026-02-10 04:00:00 CS 350 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 02:00:00 CS 2026-02-10 03:00:00 CS 314 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 01:00:00 CS 2026-02-10 02:00:00 CS 314 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 00:00:00 CS 2026-02-10 01:00:00 CS 314 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 23:00:00 CS 2026-02-10 00:00:00 CS 314 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 21:00:00 CS 2026-02-09 22:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 20:00:00 CS 2026-02-09 21:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 19:00:00 CS 2026-02-09 20:00:00 CS 305 MW 2026-02-09 14:49:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 18:00:00 CS 2026-02-09 19:00:00 CS 305 MW 2026-02-09 14:49:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 17:00:00 CS 2026-02-09 18:00:00 CS 305 MW 2026-02-09 14:49:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 16:00:00 CS 2026-02-09 17:00:00 CS 305 MW 2026-02-09 14:49:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 15:00:00 CS 2026-02-09 16:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 14:00:00 CS 2026-02-09 15:00:00 CS 380 MW 2026-02-09 08:42:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 13:00:00 CS 2026-02-09 14:00:00 CS 425 MW 2026-02-09 08:42:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 12:00:00 CS 2026-02-09 13:00:00 CS 425 MW 2026-02-09 08:42:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 11:00:00 CS 2026-02-09 12:00:00 CS 380 MW 2026-02-09 10:27:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 10:00:00 CS 2026-02-09 11:00:00 CS 401 MW 2026-02-09 09:27:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 09:00:00 CS 2026-02-09 10:00:00 CS 380 MW 2026-02-09 07:45:08 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 08:00:00 CS 2026-02-09 09:00:00 CS 380 MW 2026-02-09 06:45:49 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 07:00:00 CS 2026-02-09 08:00:00 CS 380 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 06:00:00 CS 2026-02-09 07:00:00 CS 425 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 05:00:00 CS 2026-02-09 06:00:00 CS 425 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 04:00:00 CS 2026-02-09 05:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 03:00:00 CS 2026-02-09 04:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 02:00:00 CS 2026-02-09 03:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 01:00:00 CS 2026-02-09 02:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 00:00:00 CS 2026-02-09 01:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 23:00:00 CS 2026-02-09 00:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 21:00:00 CS 2026-02-09 22:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 20:00:00 CS 2026-02-09 21:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 19:00:00 CS 2026-02-09 20:00:00 CS 343 MW 2026-02-09 14:57:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 18:00:00 CS 2026-02-09 19:00:00 CS 343 MW 2026-02-09 14:57:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 17:00:00 CS 2026-02-09 18:00:00 CS 343 MW 2026-02-09 14:57:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 16:00:00 CS 2026-02-09 17:00:00 CS 343 MW 2026-02-09 14:57:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 15:00:00 CS 2026-02-09 16:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 14:00:00 CS 2026-02-09 15:00:00 CS 270 MW 2026-02-09 08:41:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 13:00:00 CS 2026-02-09 14:00:00 CS 225 MW 2026-02-09 08:41:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 12:00:00 CS 2026-02-09 13:00:00 CS 225 MW 2026-02-09 08:41:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 11:00:00 CS 2026-02-09 12:00:00 CS 270 MW 2026-02-09 10:27:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 10:00:00 CS 2026-02-09 11:00:00 CS 249 MW 2026-02-09 09:27:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 09:00:00 CS 2026-02-09 10:00:00 CS 270 MW 2026-02-09 07:43:53 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 08:00:00 CS 2026-02-09 09:00:00 CS 270 MW 2026-02-09 06:44:14 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 07:00:00 CS 2026-02-09 08:00:00 CS 270 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 06:00:00 CS 2026-02-09 07:00:00 CS 225 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 05:00:00 CS 2026-02-09 06:00:00 CS 225 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 04:00:00 CS 2026-02-09 05:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 03:00:00 CS 2026-02-09 04:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 02:00:00 CS 2026-02-09 03:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 01:00:00 CS 2026-02-09 02:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 00:00:00 CS 2026-02-09 01:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 23:00:00 CS 2026-02-09 00:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 21:00:00 CS 2026-02-08 22:00:00 CS 300 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 20:00:00 CS 2026-02-08 21:00:00 CS 300 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 19:00:00 CS 2026-02-08 20:00:00 CS 265 MW 2026-02-08 11:49:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 18:00:00 CS 2026-02-08 19:00:00 CS 265 MW 2026-02-08 15:14:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 17:00:00 CS 2026-02-08 18:00:00 CS 248 MW 2026-02-08 15:14:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 16:00:00 CS 2026-02-08 17:00:00 CS 248 MW 2026-02-08 13:53:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 15:00:00 CS 2026-02-08 16:00:00 CS 248 MW 2026-02-08 13:53:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 14:00:00 CS 2026-02-08 15:00:00 CS 225 MW 2026-02-08 11:17:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 13:00:00 CS 2026-02-08 14:00:00 CS 240 MW 2026-02-08 11:49:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 12:00:00 CS 2026-02-08 13:00:00 CS 285 MW 2026-02-08 10:47:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 11:00:00 CS 2026-02-08 12:00:00 CS 300 MW 2026-02-08 09:32:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 10:00:00 CS 2026-02-08 11:00:00 CS 315 MW 2026-02-08 08:45:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 09:00:00 CS 2026-02-08 10:00:00 CS 371 MW 2026-02-08 07:50:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 08:00:00 CS 2026-02-08 09:00:00 CS 363 MW 2026-02-08 05:50:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 07:00:00 CS 2026-02-08 08:00:00 CS 340 MW 2026-02-08 05:55:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 06:00:00 CS 2026-02-08 07:00:00 CS 300 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 05:00:00 CS 2026-02-08 06:00:00 CS 300 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 04:00:00 CS 2026-02-08 05:00:00 CS 300 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 03:00:00 CS 2026-02-08 04:00:00 CS 225 MW 2026-02-08 01:58:09 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 02:00:00 CS 2026-02-08 03:00:00 CS 225 MW 2026-02-07 20:47:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 01:00:00 CS 2026-02-08 02:00:00 CS 225 MW 2026-02-07 20:47:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 00:00:00 CS 2026-02-08 01:00:00 CS 225 MW 2026-02-07 20:47:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 23:00:00 CS 2026-02-08 00:00:00 CS 225 MW 2026-02-07 20:47:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 21:00:00 CS 2026-02-08 22:00:00 CS 350 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 20:00:00 CS 2026-02-08 21:00:00 CS 350 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 19:00:00 CS 2026-02-08 20:00:00 CS 385 MW 2026-02-08 11:50:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 18:00:00 CS 2026-02-08 19:00:00 CS 383 MW 2026-02-08 15:12:34 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 17:00:00 CS 2026-02-08 18:00:00 CS 400 MW 2026-02-08 15:12:34 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 16:00:00 CS 2026-02-08 17:00:00 CS 401 MW 2026-02-08 13:50:02 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 15:00:00 CS 2026-02-08 16:00:00 CS 401 MW 2026-02-08 13:50:02 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 14:00:00 CS 2026-02-08 15:00:00 CS 425 MW 2026-02-08 11:18:07 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 13:00:00 CS 2026-02-08 14:00:00 CS 410 MW 2026-02-08 11:50:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 12:00:00 CS 2026-02-08 13:00:00 CS 365 MW 2026-02-08 10:47:52 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 11:00:00 CS 2026-02-08 12:00:00 CS 350 MW 2026-02-08 09:32:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 10:00:00 CS 2026-02-08 11:00:00 CS 334 MW 2026-02-08 08:46:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 09:00:00 CS 2026-02-08 10:00:00 CS 276 MW 2026-02-08 07:48:36 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 08:00:00 CS 2026-02-08 09:00:00 CS 284 MW 2026-02-08 05:48:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 07:00:00 CS 2026-02-08 08:00:00 CS 308 MW 2026-02-08 05:52:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 06:00:00 CS 2026-02-08 07:00:00 CS 350 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 05:00:00 CS 2026-02-08 06:00:00 CS 350 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 04:00:00 CS 2026-02-08 05:00:00 CS 350 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 03:00:00 CS 2026-02-08 04:00:00 CS 425 MW 2026-02-08 01:59:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 02:00:00 CS 2026-02-08 03:00:00 CS 425 MW 2026-02-07 20:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 01:00:00 CS 2026-02-08 02:00:00 CS 425 MW 2026-02-07 20:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 00:00:00 CS 2026-02-08 01:00:00 CS 425 MW 2026-02-07 20:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 23:00:00 CS 2026-02-08 00:00:00 CS 425 MW 2026-02-07 20:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 21:00:00 CS 2026-02-07 22:00:00 CS 328 MW 2026-02-07 19:45:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 20:00:00 CS 2026-02-07 21:00:00 CS 283 MW 2026-02-07 18:34:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 19:00:00 CS 2026-02-07 20:00:00 CS 350 MW 2026-02-06 20:34:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 18:00:00 CS 2026-02-07 19:00:00 CS 425 MW 2026-02-07 15:38:34 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 17:00:00 CS 2026-02-07 18:00:00 CS 425 MW 2026-02-07 15:37:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 16:00:00 CS 2026-02-07 17:00:00 CS 385 MW 2026-02-07 14:55:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 15:00:00 CS 2026-02-07 16:00:00 CS 385 MW 2026-02-07 13:51:11 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 14:00:00 CS 2026-02-07 15:00:00 CS 385 MW 2026-02-07 12:52:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 13:00:00 CS 2026-02-07 14:00:00 CS 425 MW 2026-02-07 10:57:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 12:00:00 CS 2026-02-07 13:00:00 CS 425 MW 2026-02-07 10:57:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 11:00:00 CS 2026-02-07 12:00:00 CS 425 MW 2026-02-07 08:54:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 10:00:00 CS 2026-02-07 11:00:00 CS 425 MW 2026-02-07 08:54:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 09:00:00 CS 2026-02-07 10:00:00 CS 425 MW 2026-02-07 07:59:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 08:00:00 CS 2026-02-07 09:00:00 CS 425 MW 2026-02-07 07:00:42 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 07:00:00 CS 2026-02-07 08:00:00 CS 425 MW 2026-02-07 02:48:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 06:00:00 CS 2026-02-07 07:00:00 CS 425 MW 2026-02-07 02:48:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 05:00:00 CS 2026-02-07 06:00:00 CS 425 MW 2026-02-07 02:48:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 04:00:00 CS 2026-02-07 05:00:00 CS 425 MW 2026-02-07 02:48:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 03:00:00 CS 2026-02-07 04:00:00 CS 425 MW 2026-02-06 21:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 02:00:00 CS 2026-02-07 03:00:00 CS 425 MW 2026-02-06 21:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 01:00:00 CS 2026-02-07 02:00:00 CS 425 MW 2026-02-06 21:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 00:00:00 CS 2026-02-07 01:00:00 CS 425 MW 2026-02-06 21:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 23:00:00 CS 2026-02-07 00:00:00 CS 425 MW 2026-02-06 20:34:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 21:00:00 CS 2026-02-07 22:00:00 CS 319 MW 2026-02-07 19:43:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 20:00:00 CS 2026-02-07 21:00:00 CS 364 MW 2026-02-07 18:38:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 19:00:00 CS 2026-02-07 20:00:00 CS 300 MW 2026-02-06 20:33:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 18:00:00 CS 2026-02-07 19:00:00 CS 225 MW 2026-02-07 15:38:34 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 17:00:00 CS 2026-02-07 18:00:00 CS 225 MW 2026-02-07 15:36:01 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 16:00:00 CS 2026-02-07 17:00:00 CS 265 MW 2026-02-07 14:54:29 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 15:00:00 CS 2026-02-07 16:00:00 CS 265 MW 2026-02-07 13:49:56 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 14:00:00 CS 2026-02-07 15:00:00 CS 265 MW 2026-02-07 12:51:01 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 13:00:00 CS 2026-02-07 14:00:00 CS 225 MW 2026-02-07 10:55:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 12:00:00 CS 2026-02-07 13:00:00 CS 225 MW 2026-02-07 10:55:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 11:00:00 CS 2026-02-07 12:00:00 CS 225 MW 2026-02-07 08:52:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 10:00:00 CS 2026-02-07 11:00:00 CS 225 MW 2026-02-07 08:52:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 09:00:00 CS 2026-02-07 10:00:00 CS 225 MW 2026-02-07 07:57:48 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 08:00:00 CS 2026-02-07 09:00:00 CS 225 MW 2026-02-07 06:59:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 07:00:00 CS 2026-02-07 08:00:00 CS 225 MW 2026-02-07 02:47:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 06:00:00 CS 2026-02-07 07:00:00 CS 225 MW 2026-02-07 02:47:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 05:00:00 CS 2026-02-07 06:00:00 CS 225 MW 2026-02-07 02:47:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 04:00:00 CS 2026-02-07 05:00:00 CS 225 MW 2026-02-07 02:47:32 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 03:00:00 CS 2026-02-07 04:00:00 CS 225 MW 2026-02-06 20:59:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 02:00:00 CS 2026-02-07 03:00:00 CS 225 MW 2026-02-06 20:59:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 01:00:00 CS 2026-02-07 02:00:00 CS 225 MW 2026-02-06 20:59:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 00:00:00 CS 2026-02-07 01:00:00 CS 225 MW 2026-02-06 20:59:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 23:00:00 CS 2026-02-07 00:00:00 CS 225 MW 2026-02-06 20:33:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 21:00:00 CS 2026-02-06 22:00:00 CS 425 MW 2026-02-06 18:31:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 20:00:00 CS 2026-02-06 21:00:00 CS 425 MW 2026-02-06 18:31:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 19:00:00 CS 2026-02-06 20:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 18:00:00 CS 2026-02-06 19:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 17:00:00 CS 2026-02-06 18:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 16:00:00 CS 2026-02-06 17:00:00 CS 375 MW 2026-02-06 12:55:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 15:00:00 CS 2026-02-06 16:00:00 CS 375 MW 2026-02-06 12:55:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 14:00:00 CS 2026-02-06 15:00:00 CS 375 MW 2026-02-06 12:55:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 13:00:00 CS 2026-02-06 14:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 12:00:00 CS 2026-02-06 13:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 11:00:00 CS 2026-02-06 12:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 10:00:00 CS 2026-02-06 11:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 09:00:00 CS 2026-02-06 10:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 08:00:00 CS 2026-02-06 09:00:00 CS 370 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 07:00:00 CS 2026-02-06 08:00:00 CS 389 MW 2026-02-06 06:33:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 06:00:00 CS 2026-02-06 07:00:00 CS 381 MW 2026-02-06 05:34:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 05:00:00 CS 2026-02-06 06:00:00 CS 389 MW 2026-02-06 04:38:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 04:00:00 CS 2026-02-06 05:00:00 CS 350 MW 2026-02-06 04:10:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 03:00:00 CS 2026-02-06 04:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 02:00:00 CS 2026-02-06 03:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 01:00:00 CS 2026-02-06 02:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 00:00:00 CS 2026-02-06 01:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 23:00:00 CS 2026-02-06 00:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 21:00:00 CS 2026-02-06 22:00:00 CS 225 MW 2026-02-06 18:30:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 20:00:00 CS 2026-02-06 21:00:00 CS 225 MW 2026-02-06 18:30:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 19:00:00 CS 2026-02-06 20:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 18:00:00 CS 2026-02-06 19:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 17:00:00 CS 2026-02-06 18:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 16:00:00 CS 2026-02-06 17:00:00 CS 275 MW 2026-02-06 12:54:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 15:00:00 CS 2026-02-06 16:00:00 CS 275 MW 2026-02-06 12:54:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 14:00:00 CS 2026-02-06 15:00:00 CS 275 MW 2026-02-06 12:54:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 13:00:00 CS 2026-02-06 14:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 12:00:00 CS 2026-02-06 13:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 11:00:00 CS 2026-02-06 12:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 10:00:00 CS 2026-02-06 11:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 09:00:00 CS 2026-02-06 10:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 08:00:00 CS 2026-02-06 09:00:00 CS 280 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 07:00:00 CS 2026-02-06 08:00:00 CS 261 MW 2026-02-06 06:33:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 06:00:00 CS 2026-02-06 07:00:00 CS 269 MW 2026-02-06 05:34:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 05:00:00 CS 2026-02-06 06:00:00 CS 261 MW 2026-02-06 04:38:46 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 04:00:00 CS 2026-02-06 05:00:00 CS 237 MW 2026-02-06 03:37:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 03:00:00 CS 2026-02-06 04:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 02:00:00 CS 2026-02-06 03:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 01:00:00 CS 2026-02-06 02:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 00:00:00 CS 2026-02-06 01:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 23:00:00 CS 2026-02-06 00:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 21:00:00 CS 2026-02-05 22:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 20:00:00 CS 2026-02-05 21:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 19:00:00 CS 2026-02-05 20:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 18:00:00 CS 2026-02-05 19:00:00 CS 380 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 17:00:00 CS 2026-02-05 18:00:00 CS 380 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 16:00:00 CS 2026-02-05 17:00:00 CS 380 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 15:00:00 CS 2026-02-05 16:00:00 CS 380 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 14:00:00 CS 2026-02-05 15:00:00 CS 395 MW 2026-02-05 12:38:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 13:00:00 CS 2026-02-05 14:00:00 CS 395 MW 2026-02-05 09:41:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 12:00:00 CS 2026-02-05 13:00:00 CS 395 MW 2026-02-05 09:41:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 11:00:00 CS 2026-02-05 12:00:00 CS 395 MW 2026-02-05 09:41:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 10:00:00 CS 2026-02-05 11:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 09:00:00 CS 2026-02-05 10:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 08:00:00 CS 2026-02-05 09:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 07:00:00 CS 2026-02-05 08:00:00 CS 425 MW 2026-02-05 04:42:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 06:00:00 CS 2026-02-05 07:00:00 CS 425 MW 2026-02-05 04:42:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 05:00:00 CS 2026-02-05 06:00:00 CS 427 MW 2026-02-05 04:37:08 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 04:00:00 CS 2026-02-05 05:00:00 CS 425 MW 2026-02-05 02:56:14 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 03:00:00 CS 2026-02-05 04:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 02:00:00 CS 2026-02-05 03:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 01:00:00 CS 2026-02-05 02:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 00:00:00 CS 2026-02-05 01:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 23:00:00 CS 2026-02-05 00:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 21:00:00 CS 2026-02-05 22:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 20:00:00 CS 2026-02-05 21:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 19:00:00 CS 2026-02-05 20:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 18:00:00 CS 2026-02-05 19:00:00 CS 270 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 17:00:00 CS 2026-02-05 18:00:00 CS 270 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 16:00:00 CS 2026-02-05 17:00:00 CS 270 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 15:00:00 CS 2026-02-05 16:00:00 CS 270 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 14:00:00 CS 2026-02-05 15:00:00 CS 255 MW 2026-02-05 12:37:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 13:00:00 CS 2026-02-05 14:00:00 CS 255 MW 2026-02-05 09:39:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 12:00:00 CS 2026-02-05 13:00:00 CS 255 MW 2026-02-05 09:39:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 11:00:00 CS 2026-02-05 12:00:00 CS 255 MW 2026-02-05 09:39:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 10:00:00 CS 2026-02-05 11:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 09:00:00 CS 2026-02-05 10:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 08:00:00 CS 2026-02-05 09:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 07:00:00 CS 2026-02-05 08:00:00 CS 225 MW 2026-02-05 04:40:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 06:00:00 CS 2026-02-05 07:00:00 CS 225 MW 2026-02-05 04:40:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 05:00:00 CS 2026-02-05 06:00:00 CS 223 MW 2026-02-05 04:37:08 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 04:00:00 CS 2026-02-05 05:00:00 CS 225 MW 2026-02-05 02:55:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 03:00:00 CS 2026-02-05 04:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 02:00:00 CS 2026-02-05 03:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 01:00:00 CS 2026-02-05 02:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 00:00:00 CS 2026-02-05 01:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 23:00:00 CS 2026-02-05 00:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 21:00:00 CS 2026-02-04 22:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 20:00:00 CS 2026-02-04 21:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 19:00:00 CS 2026-02-04 20:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 18:00:00 CS 2026-02-04 19:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 17:00:00 CS 2026-02-04 18:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 16:00:00 CS 2026-02-04 17:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 15:00:00 CS 2026-02-04 16:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 14:00:00 CS 2026-02-04 15:00:00 CS 395 MW 2026-02-04 11:55:41 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 13:00:00 CS 2026-02-04 14:00:00 CS 395 MW 2026-02-04 08:46:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 12:00:00 CS 2026-02-04 13:00:00 CS 475 MW 2026-02-04 09:52:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 11:00:00 CS 2026-02-04 12:00:00 CS 391 MW 2026-02-04 10:27:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 10:00:00 CS 2026-02-04 11:00:00 CS 395 MW 2026-02-04 08:46:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 09:00:00 CS 2026-02-04 10:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 08:00:00 CS 2026-02-04 09:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 07:00:00 CS 2026-02-04 08:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 06:00:00 CS 2026-02-04 07:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 05:00:00 CS 2026-02-04 06:00:00 CS 380 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 04:00:00 CS 2026-02-04 05:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 03:00:00 CS 2026-02-04 04:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 02:00:00 CS 2026-02-04 03:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 01:00:00 CS 2026-02-04 02:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 00:00:00 CS 2026-02-04 01:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 23:00:00 CS 2026-02-04 00:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 21:00:00 CS 2026-02-04 22:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 20:00:00 CS 2026-02-04 21:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 19:00:00 CS 2026-02-04 20:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 18:00:00 CS 2026-02-04 19:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 17:00:00 CS 2026-02-04 18:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 16:00:00 CS 2026-02-04 17:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 15:00:00 CS 2026-02-04 16:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 14:00:00 CS 2026-02-04 15:00:00 CS 255 MW 2026-02-04 11:54:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 13:00:00 CS 2026-02-04 14:00:00 CS 255 MW 2026-02-04 08:45:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 12:00:00 CS 2026-02-04 13:00:00 CS 175 MW 2026-02-04 09:51:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 11:00:00 CS 2026-02-04 12:00:00 CS 259 MW 2026-02-04 10:27:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 10:00:00 CS 2026-02-04 11:00:00 CS 255 MW 2026-02-04 08:45:02 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 09:00:00 CS 2026-02-04 10:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 08:00:00 CS 2026-02-04 09:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 07:00:00 CS 2026-02-04 08:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 06:00:00 CS 2026-02-04 07:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 05:00:00 CS 2026-02-04 06:00:00 CS 270 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 04:00:00 CS 2026-02-04 05:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 03:00:00 CS 2026-02-04 04:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 02:00:00 CS 2026-02-04 03:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 01:00:00 CS 2026-02-04 02:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 00:00:00 CS 2026-02-04 01:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 23:00:00 CS 2026-02-04 00:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 21:00:00 CS 2026-02-03 22:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 20:00:00 CS 2026-02-03 21:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 19:00:00 CS 2026-02-03 20:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 18:00:00 CS 2026-02-03 19:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 17:00:00 CS 2026-02-03 18:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 16:00:00 CS 2026-02-03 17:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 15:00:00 CS 2026-02-03 16:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 14:00:00 CS 2026-02-03 15:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 13:00:00 CS 2026-02-03 14:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 12:00:00 CS 2026-02-03 13:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 11:00:00 CS 2026-02-03 12:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 10:00:00 CS 2026-02-03 11:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 09:00:00 CS 2026-02-03 10:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 08:00:00 CS 2026-02-03 09:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 07:00:00 CS 2026-02-03 08:00:00 CS 350 MW 2026-02-03 06:27:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 06:00:00 CS 2026-02-03 07:00:00 CS 350 MW 2026-02-03 05:27:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 05:00:00 CS 2026-02-03 06:00:00 CS 350 MW 2026-02-03 04:27:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 04:00:00 CS 2026-02-03 05:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 03:00:00 CS 2026-02-03 04:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 02:00:00 CS 2026-02-03 03:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 01:00:00 CS 2026-02-03 02:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 00:00:00 CS 2026-02-03 01:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 23:00:00 CS 2026-02-03 00:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 21:00:00 CS 2026-02-03 22:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 20:00:00 CS 2026-02-03 21:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 19:00:00 CS 2026-02-03 20:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 18:00:00 CS 2026-02-03 19:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 17:00:00 CS 2026-02-03 18:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 16:00:00 CS 2026-02-03 17:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 15:00:00 CS 2026-02-03 16:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 14:00:00 CS 2026-02-03 15:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 13:00:00 CS 2026-02-03 14:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 12:00:00 CS 2026-02-03 13:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 11:00:00 CS 2026-02-03 12:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 10:00:00 CS 2026-02-03 11:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 09:00:00 CS 2026-02-03 10:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 08:00:00 CS 2026-02-03 09:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 07:00:00 CS 2026-02-03 08:00:00 CS 300 MW 2026-02-03 06:27:27 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 06:00:00 CS 2026-02-03 07:00:00 CS 300 MW 2026-02-03 05:27:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 05:00:00 CS 2026-02-03 06:00:00 CS 300 MW 2026-02-03 04:27:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 04:00:00 CS 2026-02-03 05:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 03:00:00 CS 2026-02-03 04:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 02:00:00 CS 2026-02-03 03:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 01:00:00 CS 2026-02-03 02:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 00:00:00 CS 2026-02-03 01:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 23:00:00 CS 2026-02-03 00:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 21:00:00 CS 2026-02-02 22:00:00 CS 304 MW 2026-02-02 18:18:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 20:00:00 CS 2026-02-02 21:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 19:00:00 CS 2026-02-02 20:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 18:00:00 CS 2026-02-02 19:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 17:00:00 CS 2026-02-02 18:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 16:00:00 CS 2026-02-02 17:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 15:00:00 CS 2026-02-02 16:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 14:00:00 CS 2026-02-02 15:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 13:00:00 CS 2026-02-02 14:00:00 CS 298 MW 2026-02-02 09:53:28 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 12:00:00 CS 2026-02-02 13:00:00 CS 298 MW 2026-02-02 09:53:28 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 11:00:00 CS 2026-02-02 12:00:00 CS 298 MW 2026-02-02 09:53:28 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 10:00:00 CS 2026-02-02 11:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 09:00:00 CS 2026-02-02 10:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 08:00:00 CS 2026-02-02 09:00:00 CS 350 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 07:00:00 CS 2026-02-02 08:00:00 CS 298 MW 2026-02-02 03:42:04 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 06:00:00 CS 2026-02-02 07:00:00 CS 298 MW 2026-02-02 03:42:04 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 05:00:00 CS 2026-02-02 06:00:00 CS 275 MW 2026-02-02 00:50:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 04:00:00 CS 2026-02-02 05:00:00 CS 275 MW 2026-02-02 00:50:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 03:00:00 CS 2026-02-02 04:00:00 CS 275 MW 2026-02-02 00:50:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 02:00:00 CS 2026-02-02 03:00:00 CS 275 MW 2026-02-02 00:50:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 01:00:00 CS 2026-02-02 02:00:00 CS 275 MW 2026-02-01 22:43:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 00:00:00 CS 2026-02-02 01:00:00 CS 275 MW 2026-02-01 22:43:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 23:00:00 CS 2026-02-02 00:00:00 CS 298 MW 2026-02-01 21:56:24 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 21:00:00 CS 2026-02-02 22:00:00 CS 344 MW 2026-02-02 19:05:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 20:00:00 CS 2026-02-02 21:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 19:00:00 CS 2026-02-02 20:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 18:00:00 CS 2026-02-02 19:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 17:00:00 CS 2026-02-02 18:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 16:00:00 CS 2026-02-02 17:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 15:00:00 CS 2026-02-02 16:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 14:00:00 CS 2026-02-02 15:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 13:00:00 CS 2026-02-02 14:00:00 CS 350 MW 2026-02-02 09:55:37 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 12:00:00 CS 2026-02-02 13:00:00 CS 350 MW 2026-02-02 09:55:37 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 11:00:00 CS 2026-02-02 12:00:00 CS 350 MW 2026-02-02 09:55:37 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 10:00:00 CS 2026-02-02 11:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 09:00:00 CS 2026-02-02 10:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 08:00:00 CS 2026-02-02 09:00:00 CS 300 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 07:00:00 CS 2026-02-02 08:00:00 CS 350 MW 2026-02-02 03:45:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 06:00:00 CS 2026-02-02 07:00:00 CS 350 MW 2026-02-02 03:45:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 05:00:00 CS 2026-02-02 06:00:00 CS 355 MW 2026-02-02 03:45:37 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 04:00:00 CS 2026-02-02 05:00:00 CS 372 MW 2026-02-02 00:53:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 03:00:00 CS 2026-02-02 04:00:00 CS 372 MW 2026-02-02 00:53:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 02:00:00 CS 2026-02-02 03:00:00 CS 372 MW 2026-02-02 00:53:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 01:00:00 CS 2026-02-02 02:00:00 CS 372 MW 2026-02-01 22:47:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 00:00:00 CS 2026-02-02 01:00:00 CS 372 MW 2026-02-01 22:47:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 23:00:00 CS 2026-02-02 00:00:00 CS 350 MW 2026-02-01 21:58:25 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 21:00:00 CS 2026-02-01 22:00:00 CS 350 MW 2026-01-31 07:00:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 20:00:00 CS 2026-02-01 21:00:00 CS 400 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 19:00:00 CS 2026-02-01 20:00:00 CS 475 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 18:00:00 CS 2026-02-01 19:00:00 CS 475 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 17:00:00 CS 2026-02-01 18:00:00 CS 475 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 16:00:00 CS 2026-02-01 17:00:00 CS 475 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 15:00:00 CS 2026-02-01 16:00:00 CS 475 MW 2026-02-01 13:04:47 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 14:00:00 CS 2026-02-01 15:00:00 CS 425 MW 2026-02-01 11:59:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 13:00:00 CS 2026-02-01 14:00:00 CS 415 MW 2026-02-01 08:21:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 12:00:00 CS 2026-02-01 13:00:00 CS 430 MW 2026-02-01 09:54:57 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 11:00:00 CS 2026-02-01 12:00:00 CS 425 MW 2026-02-01 10:27:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 10:00:00 CS 2026-02-01 11:00:00 CS 415 MW 2026-02-01 08:21:59 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 09:00:00 CS 2026-02-01 10:00:00 CS 400 MW 2026-01-31 07:00:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 08:00:00 CS 2026-02-01 09:00:00 CS 411 MW 2026-02-01 07:32:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 07:00:00 CS 2026-02-01 08:00:00 CS 416 MW 2026-02-01 06:32:06 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 06:00:00 CS 2026-02-01 07:00:00 CS 414 MW 2026-02-01 05:32:09 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 05:00:00 CS 2026-02-01 06:00:00 CS 421 MW 2026-02-01 04:34:06 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 04:00:00 CS 2026-02-01 05:00:00 CS 380 MW 2026-01-31 21:46:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 03:00:00 CS 2026-02-01 04:00:00 CS 425 MW 2026-01-31 21:46:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 02:00:00 CS 2026-02-01 03:00:00 CS 425 MW 2026-01-31 22:19:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 01:00:00 CS 2026-02-01 02:00:00 CS 425 MW 2026-01-31 22:19:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 00:00:00 CS 2026-02-01 01:00:00 CS 425 MW 2026-01-31 22:19:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 21:00:00 CS 2026-02-01 22:00:00 CS 300 MW 2026-01-31 07:00:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 20:00:00 CS 2026-02-01 21:00:00 CS 250 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 19:00:00 CS 2026-02-01 20:00:00 CS 175 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 18:00:00 CS 2026-02-01 19:00:00 CS 175 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 17:00:00 CS 2026-02-01 18:00:00 CS 175 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 16:00:00 CS 2026-02-01 17:00:00 CS 175 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 15:00:00 CS 2026-02-01 16:00:00 CS 175 MW 2026-02-01 13:03:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 14:00:00 CS 2026-02-01 15:00:00 CS 225 MW 2026-02-01 11:58:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 13:00:00 CS 2026-02-01 14:00:00 CS 235 MW 2026-02-01 08:20:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 12:00:00 CS 2026-02-01 13:00:00 CS 220 MW 2026-02-01 09:53:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 11:00:00 CS 2026-02-01 12:00:00 CS 225 MW 2026-02-01 10:27:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 10:00:00 CS 2026-02-01 11:00:00 CS 235 MW 2026-02-01 08:20:33 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 09:00:00 CS 2026-02-01 10:00:00 CS 250 MW 2026-01-31 07:00:17 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 08:00:00 CS 2026-02-01 09:00:00 CS 239 MW 2026-02-01 07:32:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 07:00:00 CS 2026-02-01 08:00:00 CS 234 MW 2026-02-01 06:32:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 06:00:00 CS 2026-02-01 07:00:00 CS 236 MW 2026-02-01 05:32:09 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 05:00:00 CS 2026-02-01 06:00:00 CS 229 MW 2026-02-01 04:34:06 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 04:00:00 CS 2026-02-01 05:00:00 CS 270 MW 2026-01-31 21:44:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 03:00:00 CS 2026-02-01 04:00:00 CS 225 MW 2026-01-31 21:44:57 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 02:00:00 CS 2026-02-01 03:00:00 CS 225 MW 2026-01-31 22:17:53 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 01:00:00 CS 2026-02-01 02:00:00 CS 225 MW 2026-01-31 22:17:53 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 00:00:00 CS 2026-02-01 01:00:00 CS 225 MW 2026-01-31 22:17:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-02 22:00:00 CS 2026-02-03 22:00:00 CS 350 MW 2026-01-25 07:00:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-02 22:00:00 CS 2026-02-03 22:00:00 CS 300 MW 2026-01-25 07:00:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-27 22:00:00 CS 2026-02-28 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-26 22:00:00 CS 2026-02-27 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-25 22:00:00 CS 2026-02-26 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-24 22:00:00 CS 2026-02-25 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-23 22:00:00 CS 2026-02-24 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-22 22:00:00 CS 2026-02-23 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-21 22:00:00 CS 2026-02-22 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-20 22:00:00 CS 2026-02-21 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-19 22:00:00 CS 2026-02-20 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-18 22:00:00 CS 2026-02-19 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-17 22:00:00 CS 2026-02-18 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-16 22:00:00 CS 2026-02-17 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-15 22:00:00 CS 2026-02-16 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-14 22:00:00 CS 2026-02-15 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-13 22:00:00 CS 2026-02-14 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-12 22:00:00 CS 2026-02-13 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-11 22:00:00 CS 2026-02-12 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-10 22:00:00 CS 2026-02-11 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-09 22:00:00 CS 2026-02-10 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-08 22:00:00 CS 2026-02-09 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-07 22:00:00 CS 2026-02-08 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-06 22:00:00 CS 2026-02-07 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-05 22:00:00 CS 2026-02-06 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-04 22:00:00 CS 2026-02-05 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-03 22:00:00 CS 2026-02-04 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-01 22:00:00 CS 2026-02-02 22:00:00 CS 350 MW 2026-01-25 07:00:15 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-27 22:00:00 CS 2026-02-28 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-26 22:00:00 CS 2026-02-27 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-25 22:00:00 CS 2026-02-26 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-24 22:00:00 CS 2026-02-24 23:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-23 22:00:00 CS 2026-02-23 23:00:00 CS 75 MW Comments:potential transmission icing 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-22 22:00:00 CS 2026-02-22 23:00:00 CS 300 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-21 22:00:00 CS 2026-02-22 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-20 22:00:00 CS 2026-02-21 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-19 22:00:00 CS 2026-02-20 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-18 22:00:00 CS 2026-02-19 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-17 22:00:00 CS 2026-02-18 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-16 22:00:00 CS 2026-02-17 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-15 22:00:00 CS 2026-02-16 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-14 22:00:00 CS 2026-02-15 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-13 22:00:00 CS 2026-02-14 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-12 22:00:00 CS 2026-02-12 23:00:00 CS 75 MW Comments:transmission icing 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-11 22:00:00 CS 2026-02-11 23:00:00 CS 300 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-10 22:00:00 CS 2026-02-11 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-09 22:00:00 CS 2026-02-10 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-08 22:00:00 CS 2026-02-09 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-07 22:00:00 CS 2026-02-08 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-06 22:00:00 CS 2026-02-07 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-05 22:00:00 CS 2026-02-06 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-04 22:00:00 CS 2026-02-05 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-03 22:00:00 CS 2026-02-04 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-01 22:00:00 CS 2026-02-02 22:00:00 CS 300 MW 2026-01-25 07:00:15 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-27 22:00:00 CS 2026-02-27 23:00:00 CS 319 MW 2026-02-27 09:23:48 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-26 22:00:00 CS 2026-02-26 23:00:00 CS 350 MW 2026-02-26 09:10:23 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-25 22:00:00 CS 2026-02-25 23:00:00 CS 350 MW 2026-02-26 16:23:21 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-24 22:00:00 CS 2026-02-24 23:00:00 CS 350 MW 2026-02-24 08:06:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-23 22:00:00 CS 2026-02-23 23:00:00 CS 350 MW 2026-02-24 03:34:10 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-22 22:00:00 CS 2026-02-22 23:00:00 CS 350 MW 2026-02-22 07:00:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-21 22:00:00 CS 2026-02-21 23:00:00 CS 350 MW 2026-02-21 13:59:31 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-20 22:00:00 CS 2026-02-20 23:00:00 CS 350 MW 2026-02-20 08:36:17 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-19 22:00:00 CS 2026-02-19 23:00:00 CS 350 MW 2026-02-19 08:12:16 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-18 22:00:00 CS 2026-02-18 23:00:00 CS 350 MW 2026-02-19 07:56:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-17 22:00:00 CS 2026-02-17 23:00:00 CS 418 MW 2026-02-18 06:41:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-16 22:00:00 CS 2026-02-16 23:00:00 CS 350 MW 2026-02-16 08:58:22 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-15 22:00:00 CS 2026-02-15 23:00:00 CS 425 MW 2026-02-15 17:44:51 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-14 22:00:00 CS 2026-02-14 23:00:00 CS 350 MW 2026-02-14 11:57:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-13 22:00:00 CS 2026-02-13 23:00:00 CS 425 MW 2026-02-13 18:26:55 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-12 22:00:00 CS 2026-02-12 23:00:00 CS 350 MW 2026-02-13 01:43:03 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-11 22:00:00 CS 2026-02-11 23:00:00 CS 235 MW 2026-02-12 10:17:27 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-10 22:00:00 CS 2026-02-10 23:00:00 CS 280 MW 2026-02-10 21:28:56 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-09 22:00:00 CS 2026-02-09 23:00:00 CS 314 MW 2026-02-09 18:35:53 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-08 22:00:00 CS 2026-02-08 23:00:00 CS 350 MW 2026-02-08 07:00:19 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-07 22:00:00 CS 2026-02-07 23:00:00 CS 358 MW 2026-02-07 20:49:20 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-06 22:00:00 CS 2026-02-06 23:00:00 CS 425 MW 2026-02-06 20:34:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-05 22:00:00 CS 2026-02-05 23:00:00 CS 350 MW 2026-02-05 08:22:45 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-04 22:00:00 CS 2026-02-04 23:00:00 CS 350 MW 2026-02-04 08:11:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-03 22:00:00 CS 2026-02-03 23:00:00 CS 350 MW 2026-02-03 08:02:46 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-02 22:00:00 CS 2026-02-02 23:00:00 CS 350 MW 2026-02-03 03:45:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-01 22:00:00 CS 2026-02-01 23:00:00 CS 395 MW 2026-02-01 18:03:43 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-27 22:00:00 CS 2026-02-28 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-26 22:00:00 CS 2026-02-27 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-25 22:00:00 CS 2026-02-26 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-24 22:00:00 CS 2026-02-25 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-23 22:00:00 CS 2026-02-24 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-22 22:00:00 CS 2026-02-23 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-21 22:00:00 CS 2026-02-22 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-20 22:00:00 CS 2026-02-21 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-19 22:00:00 CS 2026-02-20 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-18 22:00:00 CS 2026-02-19 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-17 22:00:00 CS 2026-02-18 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-16 22:00:00 CS 2026-02-17 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-15 22:00:00 CS 2026-02-16 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-14 22:00:00 CS 2026-02-15 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-13 22:00:00 CS 2026-02-14 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-12 22:00:00 CS 2026-02-13 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-11 22:00:00 CS 2026-02-12 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-10 22:00:00 CS 2026-02-11 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-09 22:00:00 CS 2026-02-10 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-08 22:00:00 CS 2026-02-09 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-07 22:00:00 CS 2026-02-08 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-06 22:00:00 CS 2026-02-07 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-05 22:00:00 CS 2026-02-06 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-04 22:00:00 CS 2026-02-05 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-03 22:00:00 CS 2026-02-04 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-02 22:00:00 CS 2026-02-03 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-01 22:00:00 CS 2026-02-02 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-27 22:00:00 CS 2026-02-27 23:00:00 CS 330 MW 2026-02-27 09:45:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-26 22:00:00 CS 2026-02-26 23:00:00 CS 300 MW 2026-02-26 09:31:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-25 22:00:00 CS 2026-02-25 23:00:00 CS 300 MW 2026-02-26 16:26:51 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-24 22:00:00 CS 2026-02-24 23:00:00 CS 75 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-23 22:00:00 CS 2026-02-23 23:00:00 CS 75 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-22 22:00:00 CS 2026-02-22 23:00:00 CS 300 MW 2026-02-22 07:00:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-21 22:00:00 CS 2026-02-21 23:00:00 CS 300 MW 2026-02-21 13:58:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-20 22:00:00 CS 2026-02-20 23:00:00 CS 300 MW 2026-02-20 08:31:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-19 22:00:00 CS 2026-02-19 23:00:00 CS 300 MW 2026-02-19 08:10:52 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-18 22:00:00 CS 2026-02-18 23:00:00 CS 300 MW 2026-02-19 07:55:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-17 22:00:00 CS 2026-02-17 23:00:00 CS 231 MW 2026-02-17 21:00:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-16 22:00:00 CS 2026-02-16 23:00:00 CS 300 MW 2026-02-16 08:56:58 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-15 22:00:00 CS 2026-02-15 23:00:00 CS 225 MW 2026-02-15 17:43:26 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-14 22:00:00 CS 2026-02-14 23:00:00 CS 300 MW 2026-02-14 11:56:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-13 22:00:00 CS 2026-02-13 23:00:00 CS 225 MW 2026-02-13 18:25:40 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-12 22:00:00 CS 2026-02-12 23:00:00 CS 75 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-11 22:00:00 CS 2026-02-11 23:00:00 CS 385 MW 2026-02-11 10:33:23 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-10 22:00:00 CS 2026-02-10 23:00:00 CS 367 MW 2026-02-10 21:32:45 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-09 22:00:00 CS 2026-02-09 23:00:00 CS 334 MW 2026-02-09 19:09:43 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-08 22:00:00 CS 2026-02-08 23:00:00 CS 300 MW 2026-02-08 07:00:19 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-07 22:00:00 CS 2026-02-07 23:00:00 CS 289 MW 2026-02-07 20:47:55 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-06 22:00:00 CS 2026-02-06 23:00:00 CS 225 MW 2026-02-06 20:33:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-05 22:00:00 CS 2026-02-05 23:00:00 CS 300 MW 2026-02-05 08:21:20 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-04 22:00:00 CS 2026-02-04 23:00:00 CS 300 MW 2026-02-04 08:10:21 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-03 22:00:00 CS 2026-02-03 23:00:00 CS 300 MW 2026-02-03 08:01:22 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-02 22:00:00 CS 2026-02-02 23:00:00 CS 300 MW 2026-02-03 03:39:00 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-01 22:00:00 CS 2026-02-01 23:00:00 CS 255 MW 2026-02-01 18:02:28 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-27 22:00:00 CS 2026-02-28 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-26 22:00:00 CS 2026-02-27 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-25 22:00:00 CS 2026-02-26 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-24 22:00:00 CS 2026-02-24 23:00:00 CS 0 MW 2026-02-24 12:56:16 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-23 22:00:00 CS 2026-02-23 23:00:00 CS 0 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-22 22:00:00 CS 2026-02-22 23:00:00 CS 100 MW 2026-02-24 09:43:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-21 22:00:00 CS 2026-02-22 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-20 22:00:00 CS 2026-02-21 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-19 22:00:00 CS 2026-02-20 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-18 22:00:00 CS 2026-02-19 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-17 22:00:00 CS 2026-02-18 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-16 22:00:00 CS 2026-02-17 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-15 22:00:00 CS 2026-02-16 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-14 22:00:00 CS 2026-02-15 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-13 22:00:00 CS 2026-02-14 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-12 22:00:00 CS 2026-02-12 23:00:00 CS 0 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-11 22:00:00 CS 2026-02-11 23:00:00 CS 100 MW 2026-02-13 08:00:50 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-10 22:00:00 CS 2026-02-11 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-09 22:00:00 CS 2026-02-10 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-08 22:00:00 CS 2026-02-09 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-07 22:00:00 CS 2026-02-08 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-06 22:00:00 CS 2026-02-07 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-05 22:00:00 CS 2026-02-06 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-04 22:00:00 CS 2026-02-05 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-03 22:00:00 CS 2026-02-04 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-02 22:00:00 CS 2026-02-03 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-01 22:00:00 CS 2026-02-02 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ NFATC 2026-02-28 22:00:00 CS 2026-02-28 23:00:00 CS 319 MW 2026-02-28 09:13:07 CS
N/NSSO/NBSO-NSSO/NB-NS/ NFATC 2026-02-28 22:00:00 CS 2026-02-28 23:00:00 CS 330 MW 2026-02-28 09:13:07 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-02-28 22:00:00 CS 2026-03-01 22:00:00 CS 350 MW 2026-01-30 06:00:13 CS
N/NSSO/NSSO-NBSO/NS-NB/ FATC 2026-01-31 22:00:00 CS 2026-02-01 22:00:00 CS 350 MW 2026-01-02 06:00:12 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-02-28 22:00:00 CS 2026-03-01 22:00:00 CS 100 MW 2026-02-27 05:57:38 CS
N/NSSO/NBSO-NSSO/NB-NS/ FATC 2026-01-31 22:00:00 CS 2026-02-01 22:00:00 CS 100 MW 2026-01-29 13:00:18 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-02-28 22:00:00 CS 2026-03-01 22:00:00 CS 350 MW 2026-02-21 07:00:24 CS
N/NSSO/NSSO-NBSO/NS-NB/ TTC 2026-01-31 22:00:00 CS 2026-02-01 22:00:00 CS 350 MW 2026-01-24 07:00:13 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-02-28 22:00:00 CS 2026-03-01 22:00:00 CS 300 MW 2026-02-21 07:00:24 CS
N/NSSO/NBSO-NSSO/NB-NS/ TTC 2026-01-31 22:00:00 CS 2026-02-01 22:00:00 CS 300 MW 2026-01-24 07:00:13 CS